Resolved
The Planning Committee was minded to grant planning permission subject to conditions and a section 106 agreement.
Planning Committee agreed this item on Thursday 2 February 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
The Planning Committee was minded to grant planning permission subject to conditions and a section 106 agreement.
Planning Committee 2 February 2017
Reference: 2016/0956/01/DET
Proposal: Erection of 200 residential dwellings (Use Class C3) with associated vehicular and pedestrian accesses, landscaping and engineering works
Location: Land to the South of Front Street, West of Dinnington Village, Dinnington, Newcastle upon Tyne
Applicant: Persimmon Homes North East
Report by: Assistant Director Planning - Investment & Development
Ward Implications: Castle
Development Management Area: SLR
Introduction
1. This application is a detailed application for the erection of 200 dwellings to the south of Front Street, Dinnington.
2. Members of the Planning Committee will recall that they carried out a site visit on 8 December 2016 to view this application site.
Site Description
3. The site at Dinnington is approximately 7.3 hectares in size and roughly rectangular in shape. The site is located to the west of the main existing residential area of Dinnington village. The site is bounded to the north by Front Street, to the west and south by agricultural fields, and to the east by an existing public right of way and residential properties.
4. The site slopes gradually towards the road with the highest areas positioned towards the southern end of the site. There are few landscape features or tree cover within the application site but there are some trees worthy of retention along the northern boundary. Smaller trees and hedges are most evident along the eastern boundary with the public right of way.
5. The application site is one of two sites allocated for housing within Dinnington following the adoption of the Core Strategy in March 2015. This site is the larger of the two and forms part of the same housing allocation under policy NV1 of the Core Strategy. The smaller site is located on the opposite side of Front Street and was granted planning approval by Planning Committee last year under planning reference 2015/1673/01/DET.
Proposal
6. The proposed development consists of the erection of 200 dwellings with associated access, landscaping and boundary treatment. These would be constructed at a density of approximately 27 dwellings per hectare.
7. The main vehicular access to the development would be taken directly from Front Street at the north of the site, the position of which has been designed to avoid conflict with established landscaping and retain as much as possible. The location of the access to the Bellway site to the north has also been considered so that both access points can work safely.
8. The proposed housing would consist of terraced, semi-detached and detached two to two and a half storey properties ranging from 2 to 5 bedrooms in size. Each property would have gardens to the front and rear, ranging in size depending on the property type, with all properties having access to at least one off street parking space. Access to each property would be from the main access roads into the development, or from areas of shared surface or private road.
9. The proposed materials for construction of the dwellings consists of brick, render and stone. The development has been laid out in three character areas designed to address the transition from countryside edge to a more modern interpretation of the village character.
10. A detailed landscaping plan has been provided which includes pockets of open space within the development but also highlights a large area of green space at the development entrance which would act as a village green. This would be a multifunctional area allowing informal recreation but also providing storage for the proposed SUDS and areas for children’s play equipment. Enhanced landscaping is also proposed to provide a landscape buffer with the greenbelt to the southern and western boundaries.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
2016/0956/01/DET: Land to the South of Front Street, West of Dinnington Village, Dinnington, Newcastle upon TyneReport | 198 KB | DownloadRead as text |
PDF |
P62febdg: Dinnington South: PLANReport | 259 KB | Download |
Follow Planning Committee at Newcastle and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 Sep 2026 | Application 2025/2070/01/EIA - Hadrian House, Higham Place, Newcastle Upon Tyne, NE1 8AF - Monument WardCommittee was minded to grant planning permission for application reference 2025/2070/01/EIA: (i) Subject to a sectio... | Agreed | Open |
| 4 Sep 2026 | Application 2015/0897/78/RES - Site Bounded by Whorlton Hall and Cottages to the North, Westerhope Golf Course to the East and Stamfordham Road and Chapel Park Estate to the South and West, Newcastle Upon Tyne, NE5 1NP - Newbiggin Hall and Callerton WardReserved matters approval for application reference 2015/0897/78/RES was granted , subject to the following condition... | Approved | Open |
| 10 Jul 2026 | Application 2026/0419/01/DET - The Balloon, Silver Lonnen, Newcastle upon Tyne, NE5 2HB - West Fenham WardPlanning permission for application reference 2026/0419/01/DET be refused for the following reasons: i. The proposed ... | Refused | Open |
| 10 Jul 2026 | Application 2026/0105/01/DET and 2026/0106/01/LBC - LD Mountain Centre, 30-34 Dean Street, Newcastle Upon Tyne, NE1 1PG - Monument WardPlanning permission for planning application reference 2026/0105/01DET be granted, subject to the following condition... | Approved | Open |
| 19 Jun 2026 | Application 2025/1251/01/DET - 7-45 Lime Street, Byker, Newcastle Upon Tyne, NE1 2PQ - Ouseburn WardCommittee was minded to grant planning permission for application reference 2025/1251/01/DET: (i) Subject to a Sectio... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.