Resolved
Decision The Committee agreed (i) the reasons for approval and delegated authority to the Manager Planning Services to determine this application subject to the following conditions and the completion of a satisfactory Section 106 agreement; and (ii) to approve planning permission with the following conditions. (a) The car park shall be adequately lit and drained to ensure that surface water does not run-off onto the public highway. (b) The use of infiltration structures to reduce surface water discharge is to be investigated and used where reasonably practicable. (c) Production of a parking layout that includes swept paths to indicate that the car park is in working order and all spaces are accessible. (d) Off street parking is to be utilised only by the residents and not for other users or for storage. (e) Detail as to protection of the means of escape in the event of fire or provision of automatic fire detection to the satisfaction of Council’s Building Control. (f) An Environmental Code shall be submitted to and approved by the Local Planning Authority. (g) Details of the proposed sound insulation scheme to be implemented. (h) Submission of a survey measuring noise (and vibration) levels generated from road traffic/rail services/aircraft. (i) Use of craneage or scaffolding at an elevation higher than that of planned development, is subject to separate consultation with London City Airport. (j) Applicant to provide 100% socially rented accommodation. (k) The proposal is to comply with all relevant Lifetime Homes criteria. (l) The applicant is to provide samples of all exterior finishes. (m) The applicant is to submit a landscaping scheme (with tree schedule). (n) Retention of existing amenity space for use by occupants of the property. Section 106 Agreement be entered into with the following Heads of Terms: 1. Renewal and reinstatement of footpaths fronting the site and removal of any redundant vehicle cross-over to Council specifications. 2. Contribution of £5000.00 towards changes to loading restrictions and permitted delivery times for the commercial use of the site. 3. Establishment of a suitable environmental code for construction/building works. 4. Contribution of £20,000 towards the implementation of a Control Parking Zone in the area. 5. The implementation of a Travel Plan to ensure that the development remains sustainable and non car journeys are encouraged.