CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Newham
Development Control Committee, Wednesday 13 February 2008

Site of Stratford Langthorn Abbey Gatehouse, Bakers Row, West Ham.

Agreed Planning 2 papers

Development Control Committee agreed this item on Wednesday 13 February 2008. Below is the council's own wording, with the papers it was decided on.

Item9

Resolved

Decision The Committee agreed the reasons for approval as outlined in the report and granted planning permission subject to the following conditions: 1. The development to which this permission relates must be commenced not later than the expiration of THREE YEARS from the date of this permission. Reasons: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 2. All works are to be completed in accordance with drawing numbers EC-UD-29/04 A, EC-UD-29/01 B and EC-UD/29/07 prepared Urban Design Group dated October 2007. No further drawings apply, unless otherwise approved in writing by the Local Planning Authority. Reasons: To ensure that the development is undertaken in accordance with the approved drawing(s), and to protect the local amenity with regard to Policy EQ19 of the London Borough of Newham Unitary Development Plan (adopted June 2001 and saved from 27th September in accordance with the directive of the Secretary of State), and Policy 4B.1 of the adopted London Plan, February 2004. The development is acceptable on the basis of the particulars contained within the application and this condition seeks to ensure the development is undertaken in strict accordance with those details as approved. 3. Prior to the commencement of works on the development hereby permitted details of the proposed the lighting system including, floodlights, supporting columns and hours of operation shall be submitted to and be approved in writing by the Local Planning Authority. Details should include appearance and technical details of the power, intensity, orientation and screening of the lamps. The approved scheme is to be completed prior to occupation of the development to the satisfaction of the Local Planning Authority and shall be permanently maintained thereafter satisfaction of the Local Planning Authority. Reasons: To ensure that amenity of adjoining residents, community and highway safety are not compromised and with regard to Policies EQ19, EQ26 and EQ45 of the London Borough of Newham Unitary Development Plan (adopted June 2001 and saved from 27th September in accordance with the directive of the Secretary of State), and Policy 4B.1 of the adopted London Plan, February 2004. 4. Prior to the commencement of any works on the site, a plan showing the proposed landscaping scheme shall be submitted ... view the full minutes text for item 9.
Word for word from the decision Newham published for this meeting. Source: mgov.newham.gov.uk

Follow this further

Built from Newham's papers

What the report saysPro

Report to Development Control Committee, 1 pages

SZ

This ma

p_is reproduced Vrom\ Ordnance\ Survey material \with

GATEHOUSE REMAINS DISPLAYED AT LOWER LEV WITH STEPPED OPEN ACCESS/SEATING DOWN

PUBLIC OPENSPACE WITH

-ARTWORK/INTERPRETA TION

O BE DESIGNED IN CONJUNCTION WITH

DLRAHIGHWAY WORKS TO CREATE-—~-

ONE CONTINUOUS SPACE IN

sslon_of\Ordnignce Survey

untrolier ‘ef Her Majesty's Stationery Office

Depot

COMMUNITY GARDEN --——__

SMALL SHELTER/BR

LOWER LEVEL : GATEHOUSE DISPLAY,

Rn ZAVTLDLIFE AREA >

Lx

VANVAN

PROPOSED TREES

PROPOSED SHRUBS/NATIVE PLANTING TO ENCOURAGE WILDLIFE

GRASS

SLAB PAVING TO MATCH PAVING USED ON DLR FORECOURT

BOUND GRAVEL PATHS/SURFACING

TIMBER STEPS/DECKING

STEPPING STONE PATH THROUGH WILDLIFE GARDEN

RAILINGS AND GATES TO COMMUNITY GARDEN AND BETWEEN GATEHOUSE DISPLAY AND ROAD

BOLLARDS

SEATS

SZ

OX AA NX

© Crown copyright. Unouthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. London Borough of Newham 100019272

2004. For reference purposes only.

No further copies may be made.

NOTES

ALL DIMENSIONS SHALL BE SITE VERIFIED & ANY DISCREPANCY BETWEEN DRAWINGS AND ACTUAL SITE CONDITION, OR DRAWING SHOWING CONFLICTING INFORMATION ABOUT ANY PARTICULAR ITEM SHALL BE BROUGHT TO THE ENGINEER/CLERK OF WORKS ATTENTION PRIOR TO CARRYING OUT ANY WORKS IN THE AFFECTED AREAS. AFFECTED WORKS SHALL ONLY BE PROGRESSED UPON ENGINEER OR CLERK OF WORKS INSTRUCTIONS.

H

SS lewham

[/Newhai

Ys a ee Di, ve i Te PL ASEUNG B 19.10.07 | Pond relocated and context works removed from plan ss except paved forecourt at west end A | .25.7.07 | Note re: context works revised 55 REV | DATE DESCRIPTION BY |CKD London Borough of

Public Realm

Engineering Consultancy Urban Design Group

CLIENT PROJECT BAKERS ROW LANGTHORNE ABBEY SITE SUBJECT

PROPOSED LANDSCAPE LAYOUT

SCALE DRAWN PRC DESIGNED ss 1:200 @ A1 cuecxro APPROVED MDS DRAWING No. i EC-UD-29/01 B DRAWN June 07 ISSUED

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
ITEM 5AReport 1 pages DownloadRead as text
PDF
Site of Stratford Langthorn Abbey Gatehouse, Bakers Row, West Ham.Report 3.1 MB Download

At this meeting

Whole meeting

Who was there

9 of 9 attended
RM
Councillor Ron ManleyChair, present
MC
Councillor Marie CollierMember, present
PH
Councillor Patricia HollandMember, present as substitute
MJ
Councillor Maureen JonesMember, present
KK
Councillor Khalil Kazi OBEMember, present
RA
Councillor Riaz Ahmed MirzaMember, present
PM
Councillor Patrick MurphyMember, present
LS
Councillor Lakmini ShahMember, present
AS
Councillor Amarjit SinghMember, present

On this subject at Newham

Search all
  1. Site of Stratford Langthorn Abbey Gatehouse, Bakers Row, West Ham.This decision
  2. Development Site 21 to 55 Arthingworth Street, Stratford, E15 4PWAgreed
  3. Garages 3 To 38 Opposite 1 - 15 David Street, Stratford, E15Agreed
  4. Garages 1 To 12 Opposite 1 - 5 Bramall Close, Stratford, London E15Agreed
  5. Development Site From Channelsea River To Canning Road Cycle Path From Stratford High Street To West Ham Station, Stratford, LondonAgreed
  6. Stratford Centre and Morgan House Development Site,The Mall, Stratford, London E15Deferred

More from Newham Development Control Committee

All decisions
MeetingDecisionOutcome
3 Mar 2010 370 Romford Road, Forest Gate, London E7 8BSDecision The Committee agreed the reasons for approval as outlined in the report and granted planning permission subj... Agreed Open
3 Mar 2010 120 High Street, E6Decision The Committee agreed to defer consideration to a later meeting. Agreed Open
3 Mar 2010 Dersingham Infant School, Lawrence Avenue, Manor Park E12Decision The Committee agreed the reasons for approval as outlined in the report and granted outline planning permiss... Agreed Open
3 Mar 2010 Eastlea Community Comprehensive School, Exing Road E16Decision The Committee agreed the reasons for approval as outlined in the report and granted full planning permission... Agreed Open
3 Mar 2010 44 The Broadway, E15Decision The Committee agreed the reasons for approval as outlined in the report and granted planning permission subj... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies