Decision The Mayor agreed: 1. to approve the planning briefs for Little Ilford, Plashet , and Stratford Schools; 2. in relation to Eleanor Smith School, to approve the planning brief as outlined in the report attached to the agenda, subject to the outcome of statutory consultation, and to delegate any resulting changes to the Divisional Director, Strategy; 3. that the Chief Executive will review Council processes to ensure Members are properly consulted before decisions are made; and 4. to receive a further report on the regeneration initiatives which BSF is helping to deliver, including information on how successful local labour, training and supply chain initiatives have been. Reasons for the Decision Funding for the development of these four schools has been agreed by the Treasury as part of the Building Schools for the Future programme. However this is conditional on planning briefs for the sites being approved. Some statutory consultation (for example with the Environment Agency) is still outstanding with respect to Eleanor Smith School, and recommendation 2 reflects this. The report and decision have complied with Part 4.5, paragraph 16 of the Constitution. The decision is not subject to the Call-In process and may be implemented immediately.
Word for word from the decision Newham published for this meeting.Source: mgov.newham.gov.uk
Newham BSF Wave 5 Report to Mayoral Proceedings 11th March 2010 - Appendix A
Planning Brief CONTENTS
1.0Introduction 1.1. Purpose and Scope of the Planning Brief 1.2. Background to Building Schools for the Future (BSF) 1.3. Development Objectives
2.0Planning Policy 2.1. National Planning Policy Guidance 2.2. Regional-Level Planning Policy Context: The London Plan 2.3. North-East London Sub-Regional Strategy and Newham 2.4. Development Context for East London 2.5. Newham – A Place of Opportunity
3.0Local Planning Policy 3.1. Newham Unitary Development Plan Policies 3.2. Additional Guidance
4.0Subject-Specific Policy 4.1. Design Approach 4.2. Site Layout, Scale and Massing 4.3. Materials and Boundary Treatment 4.4. Access 4.5. Transport 4.6. Sunlight 4.7. Air Quality 4.8. Noise 4.9. Environment, Energy Efficiency and Green Construction 4.10. Ground Conditions 4.11. Landscaping 4.12. Trees 4.13. Flood Risk 4.14. Groundwater 4.15. Surface Water 4.16. Ecology 4.17. Archaeology and Built Heritage 4.18. Accommodation During Construction
5.0Planning Application Requirements (PAR) for the London Borough of Newham
Appendix: School-Specific Briefs (1A: Little Ilford School; 1B: Stratford School; 1C: Plashet School, 1D: Eleanor Smith School)
Detailed Planning Brief March 2010 Newham BSF Wave 5 Report to Mayoral Proceedings 11th March 2010 - Appendix A
1.0INTRODUCTION
The purpose of this Detailed Planning Brief is to set guidance for the redevelopment of secondary schools within the London Borough of Newham under the Building Schools for the Future initiative. Newham’s BSF Wave 5 programme comprises 11 existing educational establishments, including two schools for students with Special Educational Needs (SEN), and two Pupil Referral Units (PRUs). One school is receiving funding for ICT provision only as it was rebuilt previously through a Private Finance Initiative (PFI) project. A new facility will be provided for post-16 students at St Angela’s and St. Bonaventure’s Catholic Schools. The Saints Sixth Form Centre will continue to be operated jointly by the two schools but will in future be housed in a separate building.
The principles outlined in this Detailed Planning Brief apply equally to all the school sites where redevelopment (to include both refurbishment and new build) is proposed to take place, as outlined below. However, it only covers in detail the three schools in the first phase of development. The schools in later phases are covered by Letters of Comfort at this stage, with Detailed Planning Briefs being developed at the appropriate time. Full Planning Permission will be required for all sites prior to redevelopment work taking place.
Phase 1 schools: 1. Little Ilford School 2. Stratford school 3. Plashet School
Later-phase schools: 1. Tunmarsh Key Stage 3 PRU 2. John F Kennedy Special School (on two sites) 3. Eleanor Smith Special School 4. Saints Sixth Form 5. St. Bonaventures 6. St Angela’s Ursuline 7. New Directions Key Stage 4 PRU
ICT-only schools: 1. Kingsford School
In addition to the schools listed above, a new 1050-place secondary school is proposed for around 2015. This school is not dealt with in detail in this document as demand for the places it would provide is subject to later confirmation when projected pupil numbers are more certain. A full feasibility exercise will be conducted closer to the time and a separate Outline Business Case, dealing specifically with the proposed new school, will be submitted to Partnerships for Schools for funding approval.
1.1Purpose and Scope of the Planning Brief
To assist future development on the school sites outlined above, this brief offers advice, outlines constraints and opportunities presented by each site, sets out guidelines for development and sets out the Council’s requirements for future planning applications. The aims of the brief are too avoid uncertainty and reduce delay, whilst maintaining greater flexibility than an Outline Planning Approval.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.