Item94
Resolved
That application 22/00754/FP be GRANTED planning permission subject to the reasons and conditions set out in the report of the Development and Conservation Manager with the following amendments to conditions 8 and 19: “Condition 8: Before the occupation of each dwelling hereby permitted, its dedicated car parking facilities shown on the approved plan shall be marked out and made available and shall thereafter be kept available solely for the parking of motor vehicles. Reason: To ensure the provision of satisfactory car parking facilities clear of the public highway to meet the needs of the development. Condition 19: Prior to the first occupation of the development hereby permitted, each residential dwelling shall be provided with an active (ready to use) EV charging point which shall thereafter be provided and permanently retained. Environmental Health Informative EV Charging Point Specification: A charging point shall be installed by an appropriately certified electrician/electrical contractor in accordance with the following specification. The necessary certification of electrical installation should be submitted as evidence of appropriate installation to meet the requirements of Part P of the most current Building Regulations. Cable and circuitry ratings should be of adequate size to ensure a minimum continuous current demand for the vehicle of 16A and a maximum demand of 32A (which is recommended for Eco developments) · A separate dedicated circuit protected by an RBCO should be provided from the main distribution board, to a suitably enclosed termination point within a garage or an accessible enclosed termination point for future connection to an external charge point. · The electrical circuit shall comply with the Electrical requirements of BS7671: 2008 as well as conform to the IET code of practice on Electric Vehicle Charging Equipment installation 2012 ISBN 978-1-84919-515-7 (PDF). This includes requirements such as ensuring the Charging Equipment integral protective device shall be at least Type A RCD (required to comply with BS EN 61851 Mode 3 charging). · If installed in a garage all conductive surfaces should be protected by supplementary protective equipotential bonding. For vehicle connecting points installed such that the vehicle can only be charged within the building, e.g. in a garage with a (non-extended) tethered lead, the PME earth may be used. For external installations the risk assessment outlined in the IET code of practice must be adopted, and may require additional earth stake or mat for the EV charging circuit. This should be installed as part of the EV ready installation to avoid significant on cost later. · A list of authorised installers (for the Government’s Electric Vehicle Homecharge Scheme) can be found at https://www.gov.uk/government/organisations/office-for-low-emission-vehicles . · UK Government is intending to issue legislation in 2021 to require domestic EV charge points to be smart, thus we recommend that all charge points will be capable of smart charging, as detailed in UK Gov consultation response. Reason: To ensure construction of a satisfactory development and to promote sustainable development in accordance with Building Regulations Part S and Policies 5, 19 and 20 of Hertfordshire's Local Transport Plan (adopted 2018).” And the ... That application 22/00754/FP be GRANTED planning permission subject to the reasons and conditions set out in the report of the Development and Conservation Manager with the following amendments to conditions 8 and 19: “Condition 8: Before the occupation of each dwelling hereby permitted, its dedicated car parking facilities shown on the approved plan shall be marked out and made available and shall thereafter be kept available solely for the parking of motor vehicles. Reason: To ensure the provision of satisfactory car parking facilities clear of the public highway to meet the needs of the development. Condition 19: Prior to the first occupation of the development hereby permitted, each residential dwelling shall be provided with an active (ready to use) EV charging point which shall thereafter be provided and permanently retained. Environmental Health Informative EV Charging Point Specification: A charging point shall be installed by an appropriately certified electrician/electrical contractor in accordance with the following specification. The necessary certification of electrical installation should be submitted as evidence of appropriate installation to meet the requirements of Part P of the most current Building ... view the full minutes text for item 94.
Word for word from the decision North Hertfordshire published for this meeting.
Source: democracy.north-herts.gov.uk