Item25
Resolved
That application 24/02889/FP be GRANTED planning permission subject to the reasons and conditions set out in the report of the Development and Conservation Manager, with the removal of clause (A), the addition of Conditions 50 to 53 and related Informative, the amendments to Conditions 3 to 5, Condition 16, Condition 18, Condition 23, Condition 25, Condition 35, Condition 36, and the combining of Conditions 27 and 49, as follows: ‘Condition 50 All development shall be constructed in accordance with the submitted and approved Flood Risk Assessment (dated 6 December 2024), this includes all new residential dwellings to have a finished floor level raised a minimum of 300mm above any flood level and 150mm above the surrounding proposed ground level unless otherwise first approved in writing by the Local Planning Authority. Reason: To ensure the flood risk is adequately addressed and not increased in accordance with NPPF and Policies of North Herts Council. Condition 51 Prior to the commencement of development, construction drawings of the surface water drainage network, associated sustainable drainage components and flow control mechanisms and a construction method statement shall be submitted and agreed in writing by the local planning authority. The scheme shall then be constructed as per the agreed drawings, method statement, Flood Risk Assessment (dated 6 December 2024) and Technical Memorandum (dated 23 May 2025) and remaining in perpetuity for the lifetime of the development unless agreed in writing by the Local Planning Authority. No alteration to the Page 3 Agenda Item 5 agreed drainage scheme shall occur without prior written approval from the Local Authority. Reason: To ensure that the development achieves a high standard of sustainability and to comply with NPPF Policies of North Herts Council. Condition 52 The development hereby approved shall not be occupied until details of the maintenance and management of the sustainable drainage scheme have been submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall be implemented prior to the first occupation of the development hereby approved and thereafter managed and maintained in accordance with the approved details in perpetuity. The Local Planning Authority shall be granted access to inspect the sustainable drainage scheme for the lifetime of the development. The details of the scheme to be submitted for approval shall include: I. a timetable for its implementation II. II. details of SuDS feature and connecting drainage structures and maintenance requirement for each aspect including a drawing showing where they are located. III. a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime. This will include the name and contact details of any appointed management company. Reason: To ensure that the development achieves a high standard of sustainability and ensure the flood risk is adequately addressed for each new dwelling and not increased in accordance with NPPF and Policies of North ...
Word for word from the decision North Hertfordshire published for this meeting.
Source: democracy.north-herts.gov.uk