25/03149/RM LAND BETWEEN ROYSTON ROAD AND, CAMBRIDGE ROAD, BARKWAY, HERTFORDSHIRE
ApprovedPlanning3 papers
AI summaryNorth Hertfordshire Planning Control Committee approves reserved matters for 140 homes in Barkway, with an amended ecology condition and a new condition on solar panels.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedReserved matters for 140 dwellings granted
MoneyNot stated
What happens nextDelegated to officerDevelopment and Conservation Manager to finalise details
Who it affectsBarkway residents and future occupantsSite between Royston and Cambridge Roads
What was decided
The committee granted reserved matters approval for 140 dwellings with associated landscaping, highways, drainage, public open space and ancillary infrastructure, following outline permission 25/02234/S73 granted on 03.12.2025. Report P1
Condition 6 on ecological enhancements was amended so the plan is required before above slab level development, rather than before any development takes place, as the applicant requested pre-commencement conditions be avoided. Report P14, P18, P19
A new Condition 9 was added requiring details of any solar PV panels, including siting, design and appearance, to be approved before installation, in preparation for the Future Homes Standard of March 2028. Report P9, P10, P11
Why
Officers gave limited weight to the Draft North Herts Design Code because it has not yet been adopted. Report P3
Consultees raised no objections of substance: Natural England, the NHC ecologist, HCC Highways and Environmental Health had no objection or no further comments, while the parish council concerns about parking balance and planting were noted. Report P7
The reconsultation followed amended plans and documents that corrected the inclusion of Bridleway 018 to the northeast and updated the landscape management and planting plans. Report P5
What happens next
The Development and Conservation Manager is delegated power to resolve any outstanding matters and update conditions with minor amendments.
An Ecological Enhancement Plan covering bird and bat boxes, hedgehog highways and swift bricks must be submitted and approved before above slab level work. Report P19
Details of any solar PV panels must be submitted and approved in writing before installation, then installed as approved. Report P10
Options considered
Chosen: Approve reserved matters with amended Condition 6 and new Condition 9. Consultees raised no overriding objections; amendments addressed pre-commencement concern and prepared for Future Homes Standard Report P7, P9, P14
Implications
Environment and climate: Ecological Enhancement Plan required, including integrated bird and bat boxes, hedgehog highways and swift bricks where building heights allow. Report P19
Environment and climate: Solar PV panel details required before installation, linked to the Future Homes Standard of March 2028. Report P9, P10
Legal: Approval is subject to conditions and delegated authority to the Development and Conservation Manager to finalise and amend.
Other: Limited weight given to the Draft North Herts Design Code as it is not yet adopted. Report P3
Who and where
Future residents of the 140 dwellings on land between Royston Road and Cambridge Road, Barkway Report P1
Barkway Parish Council, who raised concerns about visitor parking balance, southern boundary planting and bridleway hedging Report P7
Users of Bridleway 018 to the northeast of the site, included in corrected plans Report P5
19/03/2026: Reconsultation on amended plans and documents started Report P4, P5
2026-04-16: Planning Control Committee considered reserved matters application 25/03149/RM Report P1
March 2028: Future Homes Standard implementation referenced for solar PV requirement Report P9
Plain English for the jargon
Reserved matters: The detailed aspects of a planning permission (access, appearance, landscaping, layout and scale) that an outline permission leaves to a later application.
Ecological Enhancement Plan (EEP): A plan setting out new wildlife features such as bird and bat boxes, swift bricks and hedgehog highways to secure biodiversity gains.
Future Homes Standard: A building standard due to take effect in March 2028 that requires new homes to have lower carbon emissions, including through solar PV panels.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item161
Resolved
That application 25/03149/RM be GRANTED planning permission subject to: (1) The delegation of powers to the Development and Conservation Manager to ( i ) resolve any outstanding matters and (ii) update conditions and information with minor amendments as required. (2) The conditions as set out in the report, with the following amendment to Condition 6 and additional Condition 9: ‘Condition 6 Prior to any above slab level development approved by this application, an Ecological Enhancement Plan (EEP) for the creation of new wildlife features such as the inclusion of integrated bird/bat boxes in buildings/structures and hedgehog highways must be submitted to and approved in writing by the local planning authority. Swift bricks should be used where building heights allow. Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements in accordance with Policy NE4 of the North Hertfordshire Local Plan (2011-2031) and the National Planning Policy Framework. Condition 9 Prior to their installation, details of any solar photovoltaic (PV) panels to be installed as part of the development hereby approved, including their siting, design and appearance, shall be submitted to and approved in writing by the Local Planning Authority. The PV panels shall thereafter be installed in accordance with the approved details. Reason: To ensure that any solar photovoltaic panels are appropriately designed and integrated into the development, in the interests of high-quality design, in accordance with Policy D1 of the North Hertfordshire Local Plan and Section 12 of the National Planning Policy Framework’
Word for word from the decision North Hertfordshire published for this meeting.Source: democracy.north-herts.gov.uk
Item 8 – 25/03149/RM – Land Between Royston Road and Cambridge Road, Barkway - Updates
Clarity on the Draft North Herts Design Code:
Reference has been made throughout the main body of the officer report to policies contained within the Draft North Herts Design Code. The report does not clarify the weighting to be given to the design code. Given that the design code has not yet been adopted, the weight given by officers in consideration of this application is limited.
Summary of consultee comments received following 19/03/26 reconsultation:
The reconsultation was to notify interested parties of the receipt of amended plans and documents that had been corrected to include Bridleway 018 to the northeast of the site. Amendments had also been made to the landscape management plan and planting plans.
All comments received are available to view in full on the NHC website.
▪ Environment Agency: ▪ No comments. ▪ Barkway Parish Council: ▪ Concerns relating to the balance of visitor parking throughout the site. ▪ Difficult to distinguish the planting scheme along the southern boundary of the site. ▪ No ‘Overall Site Perspective’ plan of the site viewed from the south. ▪ Want to see continuation of hedging along bridleway and ensure that no changes are made to the gated entrance onto Cambridge Road. ▪ Environmental Health: ▪ No further comments. ▪ HCC Highways: ▪ No objection. ▪ Natural England: ▪ No objection –The mitigation suggested by Natural England was considered at the outline planning stage within the officer report and it not relevant to this reserved matters application. ▪ NHC Housing Officer: ▪ Repeat of original consultation response raising concerns around the provision of the two bungalows and that one bungalow should be changed to a 3-bed M4(3) bungalow. These comments have been addressed within the officer report. ▪ Lead Local Flood Authority: ▪ Addressed within the officer report. Objection to the discharge of Condition 21, which no longer forms part of the consideration of this application. ▪ HCC Public Rights of Way: ▪ No additional comments. ▪ NHC Ecologist: ▪ No objection subject to Ecological Enhancements condition. ▪ Sports England: ▪ No comments. ▪ Anglian Water: ▪ No comments. ▪ Historic England: ▪ No comments.
Recommended Additional Condition:
In order to comply with the implementation of the Future Homes Standard of March 2028, some, but not all plots, within the development will need to meet this standard, which includes the installation of PV panels. It is not know which plots would require solar panels and therefore the following condition is therefore recommended.
‘Prior to their installation, details of any solar photovoltaic (PV) panels to be installed as part of the development hereby approved, including their siting, design and appearance, shall be submitted to and approved in writing by the Local Planning Authority. The PV panels shall thereafter be installed in accordance with the approved details.
Reason: To ensure that any solar photovoltaic panels are appropriately designed and integrated into the development, in the interests of high-quality design, in accordance with Policy D1 of the North Hertfordshire Local Plan and Section 12 of the National Planning Policy Framework.
Amendment to Existing Conditions:
Condition 6 - Ecological Enhancements
The applicant has requested that pre-commencement conditions be avoided where possible. Therefore, Condition 6 has been amended to be ‘prior to above slab level’
Original wording:
No development shall take place until an Ecological Enhancement Plan (EEP) for the creation of new wildlife features such as the inclusion of integrated bird/bat boxes in buildings/structures and hedgehog highways has been submitted to and approved in writing by the local planning authority. Swift bricks should be used where building heights allow.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.