Resolved
Approved: The installation of LED lighting throughout the Kesteven Street and Lafford Terrace offices. That the project is funded from the Councils Renewals Reserve.
Executive Board approved this item on Tuesday 6 December 2011. Below is the council's own wording, with the papers it was decided on.
Resolved
Approved: The installation of LED lighting throughout the Kesteven Street and Lafford Terrace offices. That the project is funded from the Councils Renewals Reserve.
Committee: Executive Board Meeting Date: 6th December 2011 Report presented by: The Corporate Director Author: Mervyn Baldry Email: Mervyn_baldry@n [email protected]
Tel: M. Baldry 01529 308226
Report Title: Lighting Improvements I To Council Offices
Key Decision Yes No Recommendation to Council Yes No Council Meeting Date: Is this report exempt or confidential Yes No
Purpose of Report To present the outcome of an exercise to consider possible improvements to the efficiency of lighting the Main Council Offices. If adopted this will reduce energy costs, and the Councils carbon emissions
The Councils Sustainability Group have considered a number of options that could reduce the energy costs and carbon emissions produced by lighting lighting the Councils Assets.
The options considered included the provision of LED lights to Boston Road Car park and movement sensors to the National Centre For Craft and Design as well as extending the current movement sensor system in Lafford Terrace into the remainder of the Kesteven Street site.
The majority of the options are not being recommended for adoption as either the Carbon saving, the capital cost or the payback period does not make them a viable option.
The project that does provide significant savings in all areas is the provision of:
1. LED lighting to Lafford Terrace and Kesteven Street Offices.
After a small trial of LED lights in Lafford Terrace it is now proposed to introduce this type of lighting throughout the offices. offices Lighting was identified as the single largest user of energy in the building after heating in the Carbon Carbon Trust survey commissioned three years ago.
The proposal is to change all existing conventional fluorescent tubes to LED tubes and to use only one lamp where currently double lamps are used. The trial has indicated that a single LED fitting has provided sufficient illumination of work space. It is not proposed to reduce the number of fittings in any location. For example a room with four double fittings will have four single lamps.
The only legal requirements are that there are 'sufficient and suitable' levels of lighting, and similar wording is used in health and safety legislation. The CIBSE Code for Lighting recommends a maintained illuminance of 500 lux for general offices (e.g. writing, typing, reading, data processing, etc.) and for CAD work stations and conference/meetings rooms. Where the main task is less demanding, e.g. filing, a lower level of 300 lux is recommended. These recommendations will be met under the proposals.
Anticipated Running Costs and Savings.
Calculations have taken into account summer and winter differences and allowed for Lafford Terrace having existing sensor controls.
Calculations based on the number of lights, patterns of use and our current electricity price of 8p per Kwh indicate the potential savings outlined below.
Summary of Costs and Savings.
• The reduction in consumption would be 120550 Kwh per annum.
• Running costs for fluorescents are £11,374 per annum. • Running costs for LED’s would be £1,730 per annum. • The reduction in running costs would therefore be £9,644 per annum.
• The anticipated annual reduction in CO2 emissions (based on the kg C02 per kWh conversion factor in the Carbon Trusts published guide of 0.537 kg CO2 per Kwh) is 64.7 Tons.
Anticipated Installation Costs.
• Cost of replacement lamps £20,000. • Estimated installation cost (subject to tender) £13,000
• Total replacement cost £33,000
Installation costs are attributable to their being an element of electrical work for the removal of electronic ballasts to facilitate the use of LED’s which function without them.
Based on the figures outlined above the projected payback period is 3.5 years.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Lighting Improvements to Council OfficesReport | 4 pages | DownloadRead as text |
Follow Executive Board at North Kesteven and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 3 Nov 2026 | Proposed Private Hire and Hackney Carriage Fees and ChargesRecommended to Council: That approval be given to undertake a consultation process on the proposed draft licensing fe... | Approved | Open |
| 3 Nov 2026 | Review of The Private Sector Housing Enforcement PolicyThat the contents of the report and policy was noted. 2. That Executive Board approved the adoption of the new Privat... | Noted | Open |
| 3 Nov 2026 | NK Plan Quarter 2 Performance Report 2026/27That the key performance indicator progress in the NK Plan was approved. 2. That the Housing Regulatory Performance r... | Approved | Open |
| 3 Nov 2026 | Grantham Road Car ParkThat the appropriation of the part of the Grantham Road site shown on the plan at Appendix 1 from the Housing Revenue... | Approved | Open |
| 3 Nov 2026 | Medium Term Financial Strategy for 2027/28That the Medium Term Financial Strategy for 2027/28 to 2031/32 was approved. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.