Resolved
RESOLVED THAT: The application be permitted in accordance with the recommendation of the Director of Services.
Planning Committee decided this item on Tuesday 8 July 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED THAT: The application be permitted in accordance with the recommendation of the Director of Services.
PLANNING APPLICATIONS- SECTION A
Installation of solar PV panels on roof, installation of a bio Report Item No mass boiler with metal flue and formation of thermal store A8
Ley Farm Callans Lane Heath End Ashby De La Zouch Application Reference 14/00355/FUL
Applicant: Date Registered [name removed] 2 May 2014
Case Officer: Target Decision Date Joe Mitson 27 June 2014
Recommendation: Permit
Site Location - Plan for indicative purposes only
Reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the controller of Her Majesty’s Stationery Office ©copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence LA 100019329)
Planning Committee 8 July 2014 Development Control Report PLANNING APPLICATIONS- SECTION A
EXECUTIVE SUMMARY OF PROPOSALS AND RECOMMENDATION
Proposal The application seeks permission for the installation of solar pv panels on an outbuilding roof, the installation of a bio mass boiler with metal flue and the formation of a thermal store.
The application is reported to Planning Committee as the applicant works for the Council.
Consultations Members will see from the main report below that no objections have been received in respect of the proposals, the Parish Council supports the proposal and English Heritage raise no objection.
Planning Policy The site is in the countryside and within the conservation area. Ley Farm is a grade II* listed building.
Conclusion The proposals would provide alternative energy sources for the property and would not adversely affect the fabric or setting of the listed dwelling or curtilage listed buildings and would preserve the character and appearance of the conservation area.
Recommendation:-
PERMIT SUBJECT TO THE IMPOSITION OF CONDITIONS.
Members are advised that the above is a summary of the proposals and key issues contained in the main report below which provides full details of all consultation responses, planning policies and the Officer's assessment, and Members are advised that this summary should be read in conjunction with the detailed report.
Planning Committee 8 July 2014 Development Control Report PLANNING APPLICATIONS- SECTION A
MAIN REPORT
1. Proposal and Background
The application comprises the installation of PV solar panels on the rear elevation of the stable block and the installation of a biomass boiler with metal flue and formation of a thermal store in the adjacent outbuilding. The 40 panels, each measuring 1.6m by 0.9m, are to be installed on the rear elevation of the stables, the biomass boiler would be sited within the store area of the outbuilding with the flue in the rear of the south-east facing barn.
The site comprises a farmhouse (grade II*) on the western side of Callans Lane within the Heath End Conservation Area. The dwelling dates from the 16th century and comprises a storey and a half building. Adjacent is the barn of brick and tile with the stable building forming the western part of the yard. The complex of buildings is set within a countryside location with limited dwellings within the locality.
There is a detailed history on the site. This includes 08/00715/LBC for external and internal alterations to the outbuilding to provide living accommodation, 08/00718/FUL comprised the associated planning application, 11/00459/EXT and 11/00460/EXT extended the time for the above applications, 13/00363/LBC related to a revised scheme to that above; all were approved.
Application 14/00356/LBC for the installation of solar PV panels on the roof, installation of bio mass boiler with metal flue and formation of thermal store, is also reported on this agenda.
2. Publicity
Neighbours have been notified.
Site Notice displayed.
Press Notice published 21 May 2014
3. Consultations
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
14/00355/FUL: Installation of solar PV panels on roof, installation of a bio mass boiler with metal flue and formation of thermal storeMinutes | 44 KB | DownloadRead as text |
Follow Planning Committee at North West Leicestershire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.