Resolved
RESOLVED to (1) approve the programme of schemes for Berridge and Sherwood wards as set out below: Berridge LTP schemes Location Type Date prioritised Estimate Details Salcombe Road Footpath 12/04/18 £10,000 Residual contribution to reconstruction of footpath on odd-numbered side of Salcombe Road. Austen Avenue area Survey 12/04/18 £2,500 Survey to evaluate parking issues on Austen Avenue. Wilkinson Street area Road safety 12/04/18 £1,600 Road lining at Wilkinson Street/Radford Road Berridge Public Realm schemes Location Type Date prioritised Estimate Details Berridge planters Planters 12/04/18 £710 Provision of 2 planters at corner of North Gate/Nottingham Road and Berridge Road/Noel Street Nottingham Road Litter bins 10/05/18 £1,050 Provision of 3 litter bins at identified locations on Nottingham Road Berridge ward Environmental 27/06/18 £1,500 Environmental work including fixing alley way gates and locks Sherwood LTP schemes Location Type Date prioritised Estimate Details Burlington Road/Hartington Road Road safety May 2018 £1,250 Further contribution to safety improvements at junction of Burlington Road/Hartington Road. Haydn Road 1 Road safety 06/06/18 £1,200 Replacement of non-working flashing amber warning light to alert drivers of school children crossing. Sherwood ward TRO TRO 06/06/18 £20,000 TRO to cover various streets in Sherwood including but not limited to Edingley Ave, Victoria Rd, Owthorpe Grove, Osborne Grove, Woodville Rd, Hall St, Mapperley St, Burlington Rd and Perry Rd to improve road safety. Haydn Road 2 Road safety 06/06/18 £28,000 Two VAs to be installed on Haydn Road to make drivers aware of their speed. Sherwood ward roundels Road safety 06/06/18 £4,500 20mph roundels to be painted on the following: Caledon Rd, Leonard Ave, Victoria Rd, Osborne Grove, Owthorpe Grove, Crossman St, Costock Rd, Edingley Ave, Perry Rd, Burlington Rd, Hartington Rd, Hardwick Rd, Compton Rd, Woodville Rd and Haydn Rd. Sherwood ward signs Road safety 06/06/18 £680 2x20mph repeater signs to be installed on each of the following roads: Edingley Ave, Compton Rd, Burlington Rd and Hardwick Rd. Perry Road Road safety 06/06/18 £125 Junction ahead warning sign to improve road safety. Buttermere Court Road safety 06/06/18 £125 ‘No through road’ sign to indicate that it is not possible to cut through Buttermere Court to Haydn Road. Sherwood withdrawn schemes Location Type Reason Amount Details Winchester Street link footpath Feasibility study Contingency funding not now required £941 Preliminary research into a right of way order, advertising and consultation regarding link footpath from Winchester St to Woodthorpe Grange Park. (2) note the commitment of funds in Berridge and Sherwood wards as set out below: Berridge 2018-2019 LTP allocation £70,100 LTP carried forward fro 2017-2018 £0 2018-2019 Public Realm allocation £26,944 Public Realm carried forward from 2017-18 £1,372 Total available 2018-19 ACF £98,416 Less LTP schemes -£14,100 Less Public Realm schemes -£1,760 Decommitted funds +£0 Remaining available balance £82,556 LTP element ... view the full minutes text for item 11.