Resolved to approve the development subject to the following conditions:- Conditions ( i ): 10/03210/CAC: 1 Commencement of work 2 Approved plans (ii): 10/03207/FUL: 1 Development begun within time limit 2 Develop in accordance with approved plans 3 Materials 4 Architectural details 5 PD rights 6 Student numbers 7 Landscape plan required 8 No felling lopping cutting 9 Landscape underground services - tree roots 10 Tree Protection Plan ( TPP ) 1 11 Arboricultural Method Statement ( AMS ) 1 12 Landscape carry out after completion 13 Landscape management plan 14 Car parking numbers 15 Control of car parking 16 Works to highway / public realm 17 Cycle parking spaces 18 External lighting 19 Travel plan 20 Construction travel plan 21 Construction management plan 22 Ground source heat pumps 23 Groundwater drainage 24 Groundwater level monitoring 25 Plant noise attenuation 26 Sustainable drainage 27 Petrol / oil interceptors 28 Natural resource impact analysis 29 Archaeology 30 Public art 31 Habitat creation The Committee imposed an additional condition requiring further cycle parking to the forecourt area and that the public art required by condition should be located in a prominent position where it could be enjoyed by the wider public Committee also added an informative on landscaping of the site to retain as many existing trees on the site as possible, and that consideration should be given to planting to the north side of the building, possibly including within University Parks.
Word for word from the decision Oxford published for this meeting.Source: mycouncil.oxford.gov.uk
Proposals: (i): 10/03210/CAC: Removal of existing ornamental gates and sections of railings fronting Lindemann building and to University parks. (ii): 10/03207/FUL: Demolition of former lodge building and removal of temporary waste stores. Erection of new physics research building on 5 levels above ground plus 2 basement levels below with 3 level link to Lindemann building. Creation of landscaped courtyard to South of new building and cycle parking to North. Re-erection of Lindemann gates to repositioned entrance to University Parks and of University Park gates to new entrance further north opposite Dept of Materials. Re-alignment of boundary railings.
Site Address: Land adjacent to the Clarendon Laboratory, Parks Road, Appendix 1.
Ward: Holywell Ward
Agent: DPDS Consulting Group Applicant: The University Of Oxford
Recommendations: Committee is recommended to grant conservation area consent and planning permission, subject to conditions.
Reasons for Approval.
1. The Council considers that the proposal accords with the policies of the development plan as summarised below. It has taken into consideration all other material matters, including matters raised in response to consultation and publicity. Any material harm that the development would otherwise give rise to can be offset by the conditions imposed.
2. The Council considers that the proposal, subject to the conditions imposed, would accord with the special character and appearance of the conservation areas it adjoins. It has taken into consideration all other material matters, including matters raised in response to consultation and publicity.
3. The planning application seeks to provide replacement and consolidated facilities for the University's Department of Physics on a site currently occupied by car
1 parking, temporary storage units and an undistinguished lodge building. The proposals are in line with planning policies to support new academic and research facilities for the University on its own landholdings at appropriate locations and delivers state of the art research facilities for the cutting edge research undertaken by the Department. The development is at a sustainable location and removes private car parking in order to create a paved and landscaped forecourt with seating. The distinctive contemporary styling and form of the building changes the relationships of buildings it adjoins including that to the Grade 1 Keble College chapel, but not such that planning permission should be withheld. A new entrance to University Parks is also provided with the potential to open up new routes. Officers conclude that the balance of advantage lies with supporting the proposals.
4. Many of the comments received from statutory agencies and third parties relate to the relationship of the proposed building to Keble College chapel in particular. However the proposals have emerged following a lengthy and detailed dialogue with City officers, English Heritage and others, and following a presentation to the South East Regional Design Panel (SERDP) which was supportive of the proposals. It is accepted by English Heritage that a building can be achieved at this location and that the University has made a strong case for its construction, but concerns are raised regarding its height and changed views in the locality. Officers do not conclude that reducing the height of the building in response is appropriate however as its proportions and form would be prejudiced as a consequence. Detailed matters relating to architectural detailing and precise choice of materials etc can be addressed by the imposition of appropriate conditions.
Conditions (i): 10/03210/CAC: 1 Commencement of work 2 Approved plans
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.