Agreed that the following works are introduced in an incremental, phased manner, to enhance the setting and visibility of the crossing - (1) provide a surface contrast to funnel pedestrians to the area between the road studs demarking the crossing. This would be delivered by introducing a buff surface for the length of the zig zags either side of the crossing – highlighting the crossing; (2) changing the colour of the poles to aid identification and location for crossing; (3) change the tactile paving to burnt red; (4) introduce seating or planters on the pavement areas either side of Royal Parade to provide a visual pointer towards the crossing point; (5) review the light timings to seek a reduction in the call time and duration of the green man, to make the crossing more appealing to users; (6) discuss with the Department for Transport the provision of count down signs to make the crossing more appealing and better inform users. (See also minute 35a)
Word for word from the decision Plymouth published for this meeting.Source: democracy.plymouth.gov.uk
The Royal Parade Armada Way pedestrian crossing was installed in 2004 to replace an existing underpass. Despite the presence of a grade separated crossing, and central barriers, pedestrian and vehicle collisions were evident at that time, and the central surface level crossing formed a package of measures intended to improve safety and pedestrian accessibility across the city centre as a whole. It caters for approximately 15,000 to 20,000 pedestrian movements a day.
Collision statistics since the crossing was installed have shown a marked and continuing decline in casualties. However, on the 26th February 2010 there was a fatal collision between a female pedestrian and a Heavy goods Vehicle. In the subsequent court hearing, Judge Francis Gilbert branded the crossing the crossing, based upon his own experience of using it, as “very hazardous”.
In response the City Council agreed to review the crossing, in conjunction with the police. The outcome of the above actions, supported by the police has been that the crossing itself is working appropriately, but that a series of measures to improve the environment around the crossing, and increase its ‘visibility’ could be undertaken. These include, in priority order for implementation:
A) Provide a surface contrast to funnel pedestrians to the area between the road studs demarking the crossing. This would be delivered by introducing a buff surface for the length of the zig zags either side of the crossing – highlighting the crossing. B) Changing the colour of the poles to aid identification and location for crossing. C) Change the tactile paving to burnt red. D) Introduce seating or planters on the pavement areas either side of Royal Parade to provide a visual pointer towards the crossing point E) Review the light timings to seek a reduction in the call time and duration of the green man, to make the crossing more appealing to users. F) Discuss with the DfT the provision of count down signs to make the crossing more appealing and better inform users. Corporate Plan 2011 – 2014:
The Royal Parade Crossing Review supports the following objectives of the Corporate Plan
• Deliver growth: Develop Plymouth as a thriving growth centre by creating the conditions for investment in quality new homes, jobs and infrastructure
• Reduce inequality: Narrow the inequality gap, particularly in health, between communities
The Royal Parade crossing lies at the heart of Plymouth’s Central Business District; it facilitates movement between the principle retail opportunities of the City, civic services and the Hoe. It is therefore crucial in supporting the vibrancy of the City Centre which in turn helps to deliver growth. The crossing also reduces inequalities. It provides a formal crossing point across a key arterial route in the City and without the crossing pedestrian movement across Royal Parade would be impaired.
Implications for Medium Term Financial Plan and Resource Implications: Including finance, human, IT and land
If all aspects are implemented, the total cost of the works will be determined as shown below:
Total scheme cost £0.089m (Capital) A Provide new high friction surfacing (buff £30,000 coloured) on both sides of crossing B Change pole colour £0.00 C Remove existing tactiles and replace with £8,000 new red tactile pavings on both sides of crossing D Measures to funnel pedestrians, including To be finalised subject to options of: New planter / trees services and adopted measures Relocation of existing seats E Review light timings £0.00
F “Count Down” signals to be added to £15,000 the pedestrian signal heads once approved by the DfT
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.