GRANTED conditionally subject further negotiation on overage and a S016 agreement, delegated to the Assistant Director for Strategic Planning and Infrastructure, in consultation with the Chair, Vice-Chair, opposition spokesperson and ward councillors, to refuse if not signed by target date or other date agreed through an extension time. (The Committee heard from Councillor Penberthy, ward member, speaking against the application ). (The Committee heard representations against the application). (The Committee heard representations in support of the application). (Councillor Nicholson’s proposal to defer for further negotiations on overage and affordable housing contribution, having been seconded by Councillor K Foster, was put to the vote and declared lost). (Councillor Jon Taylor’s proposal to include consultation on the overage clause in the S106 agreement with Chair, Vice-Chair, opposition spokesperson and ward councillors, having been seconded by Councillor Stevens, was put to the vote and declared carried). (A Planning Committee site visit was held on 11 March 2015 in respect of this application ). (The meeting adjourned at 5.40 pm for officers to talk to the applicant on overage and the affordable housing contribution). (The meeting reconvened at 5.50 pm).
Word for word from the decision Plymouth published for this meeting.Source: democracy.plymouth.gov.uk
Item Number: 6.1 Site: Millbay Marina Village, Custom House Lane Application Number: 14/01103/FUL Applicant: Linden Homes Ltd Pages: 9-67
Revisions to proposed scheme: Further revisions have been made to the sea defence walls. The ’outer’ wall which runs along the seaward edge of Millbay Pier will be retained at it’s existing height of 6.2m above ordnance datum (AOD) with the addition of a 1.1m high balustrade on top. The wall will be extended to wrap around the end of the pier at a height of 6.5m. The step up from 6.2 to 6.5 is in line with the western end of Block A. Additional works to the existing sea defence wall include the removal of the recurve profile.
The wall which runs between proposed Blocks A and B adjacent to the proposed visitor parking will be increased in height from 6.2m AOD, as existing, to 7.1m AOD. The adjacent ground level will be increased in height, with a gradual slope peaking at 0.5m above existing levels; consequently the finished floor level at the sea defence wall will be 5.6m AOD.
The outer sea wall in front of Block B, will measure 7.1m AOD in height up to approximately the midpoint of Block B. The wall will then rise gradually to a level of 7.5m AOD and will adjoin the wall which currently abuts the South West Coast Path.
‘Inner’ sea defence walls are also proposed; these are integral to the design of the buildings. The height of the integral wall to Block A has been increased to 10.95m AOD. As a result the lower level residential accommodation of the combined first- and second-storey duplex units has been lost as the lower level windows had to be removed to accommodate the revised wall height. Consequently, twelve 2-bed duplex units have been revised to form twelve 1-bed flats, each with an internal floor space of 40m² and the ground-floor car park is now double height. (This is true for the southern and central section, but the duplex units on the north elevation are being retained. The parking spaces under the duplex units remain single storey.) The proposed walkway which abuts Block A is proposed at a height of 6m AOD.
Block B also has an integral sea defence wall measuring 10.0m AOD. The upper 1.1m of this wall will serve as the balustrade for the balconies serving the first-floor accommodation. A glazing panel
Version1 March 2013 Not protectively marked OR Protect OR Restricted has been introduced above this wall to ensure that these ‘balconies’ are enclosed as a further flood protection measure.
The ramped walkway link to the South West Coast Path in front of Block B now abuts the sea wall as it enters the site (rather than abutting the building). This directs pedestrians and cyclist towards the pier, avoiding any conflict with the road/car parking and a right angled end-stop is no longer needed. This change has also facilitated the provision of two additional visitor parking spaces – a total of 198 parking spaces are now proposed.
Further to the two additional spaces, the proposed parking layout has been revised. All of the visitor parking is now located outside Blocks A and B. These spaces will be controlled by the management company and vacated in severe weather conditions. Further, these spaces will be non-demarcated to improve the public realm. Some of the allocated parking for Block A is now sited adjacent to Block C.
In addition, the proposed balconies to the east elevation of Block B have been replaced with Juliette balconies and the first-floor balcony has been removed and replaced with a window, as recommended by the EA.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.