DECISION: the Cabinet Member for Traffic and Transportation, Councillor Fazackarley agreed in principle option 3, consisting of raised tables constructed within Doyle Avenue, be implemented and that a Traffic Regulation Order is made and advertised regarding the proposed installation of traffic calming within Doyle Avenue.
Word for word from the decision Portsmouth published for this meeting.Source: democracy.portsmouth.gov.uk
1.1To consider the responses to the public consultation and drop-in session regarding the proposals to implement traffic calming within Doyle Avenue.
Recommendations
2.1That Option 3, consisting or raised tables constructed within Doyle Avenue, is considered for implementation;
2.2That a Traffic Regulation Order (TRO) is made and advertised regarding the proposed installation of traffic calming within Doyle Avenue;
Background
3.1Following a request from the Local Councillors, Portsmouth City Council have been asked to canvas residents' views regarding whether they would support the introduction of a traffic calming scheme within Doyle Avenue. Traffic surveys have been carried out within Doyle Avenue to ascertain if this is an issue with traffic exceeding the 20mph speed restriction implemented within the area.
3.2Doyle Avenue is a heavily trafficked residential road due to the location of Northern Parade Junior School on a shared site with the Infants and the Children’s Centre. Residents have complained of it being utilised as a ‘rat-run’ by traffic wishing to access Northern Parade from London Road and vice-versa. Doyle Avenue, along with surrounding residential roads within the vicinity, is part of the citywide 20mph speed limit which was implemented in October 2007. Since that time, several traffic surveys have been conducted within Doyle Avenue to detect the average speed of vehicles utilising the area and traffic counts.
1 www.portsmouth.gov.uk 3.3 Representations have been received from local residents who have raised concerns around speeding vehicles travelling along the road in opposite directions. In addition, residents perceive that their road is being used as ‘rat- runs’ to avoid delays in travelling times.
3.4Traffic surveys to ascertain both the average speeds and 85th percentile speeds were carried out within Doyle Avenue between 07 November 2012 and 14 November 2012. The surveys recorded average speeds of 21mph and an 85th percentile speed of 27.5mph for westbound traffic. An average speed of 22mph and an 85th percentile speed of 28.6mph were recorded for eastbound traffic. This survey was undertaken by Hampshire Constabulary on behalf of the City Council.
3.5An analysis of accident data recorded by Hampshire Constabulary over the 5 year period 01st August 2008 to 31st July 2013 indicates that there have been 3 accidents within the area of Doyle Avenue. All of these incidents have been recorded as ‘slight’ accidents and all have occurred at the junction of London Road/Doyle Avenue. There are no accidents recorded for this time period that have occurred within Doyle Avenue.
3.6A postal consultation was carried out with residents of Doyle Avenue and the adjoining roads from the end of June 2013 until 12 August 2013. The results were as follows:-
Portsmouth City Council sent out 208 consultation letters, associated sketches and voting forms to the residents within the area. From the 208 letters addressed to residents we received 68 completed voting forms (a return of 33%). The breakdown of the results is as follows:
Option 1 - Consisting of the proposed construction of 4 number priority gateways/chicanes within Doyle Avenue – received 12 votes from residents (18% of the returns)
Option 2 - Consisting of the proposed construction of gateway and entry treatments within Doyle Avenue – received 4 votes from residents (6% of the returns)
Option 3 - Consisting of the proposed construction of 4 number raised tables at the junctions within Doyle Avenue – received 25 votes from residents (38% of the returns)
Option 4 - That the existing layout of Doyle Avenue remains unchanged – received 25 votes from residents (38% of the returns)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.