DECISION the Cabinet Member for Housing agreed: (1) That approval be given to accept a tender for a lead consultant based on an estimated overall budget of up to £800K for the initial feasibility study, design and management of the scheme. (2) That following a full tender evaluation, authority to enter into contract with the preferred bidder be delegated to the Head of Housing and Property Services in consultation with the Head of Finance and Section 151 Officer. (3) That approval be given to spend up to £100K for the initial structural and feasibility report including costed options.
Word for word from the decision Portsmouth published for this meeting.Source: democracy.portsmouth.gov.uk
1.1To seek permission to appoint an external lead consultant to undertake a feasibility study, design and manage a scheme to improve and maintain 2No high rise blocks of flats, Tipton House and Edgbaston House.
1.2To seek permission to initially spend £100K for external lead consultants to undertake a full structural survey and feasibility study, providing detailed costed options to achieve the client brief for the project.
A further report will be submitted to the Cabinet Member for Housing by December 2015 to seek approval to proceed with the refurbishment works and will be dependent on the options assessed as part of the feasibility study. The report will include a financial appraisal for the cost of the works together with the additional associated fees to design and manage the project with the same lead consultant, which are estimated to be a further £700K. The additional services required will include;
Design development of the agreed option, preparing detailed design and specification for all planning/ building control approvals, procurement of a contractor to undertake the project, contract administration services together with project management until handover and cost control until settlement of final account.
1.3If approved, it is anticipated that the consultant would commence the feasibility study in June 2015 and the outcome of the feasibility report will be reported to the Cabinet Member for Housing by December 2015. If permission is given to proceed with the scheme it is anticipated that a contractor will commence on site during 2017.
1 www.portsmouth.gov.uk 2. Recommendations
i. That approval is given to accept a tender for a lead consultant based on an estimated overall budget of up to £800K for the initial feasibility study, design and management of the scheme.
ii That following a full tender evaluation, authority to enter into contract with the preferred bidder is delegated to the Head of Housing and Property Services in consultation with the Head of Finance and Section 151 Officer.
Iii That approval is given to spend up to £100K for the initial structural and feasibility report including costed options.
Background
3.1All the properties in Tipton House and Edgbaston House are located within the St Thomas ward; both blocks are 18 storeys high and were constructed in 1966 using the 'Bison' precast concrete panel construction method.
3.2Tipton House and Edgbaston House both contain 136no properties each; therefore there will be 272no properties included within the proposed scheme. Each block contains a 50:50 mix of one and two bedroom flats.
3.3There are two leaseholders that will be affected by the scheme; one leaseholder is present in each of the blocks.
3.4The age of the blocks is such that to ensure any refurbishment works are viable an assurance is required that the building structure will be sustainable as a lettable asset for at least 30 years.
It is proposed that a full structural survey will be undertaken and any structural work identified will be incorporated within the proposed scheme. If it is not viable to refurbish the blocks a further report will be submitted to the Cabinet Member for Housing recommending an alternative project.
3.5Both blocks have poor thermal performance due to their height and the built construction method, typically they have an average RdSAP rating of 52 (Band E) compared to a PCC housing stock average RdSAP rating of 71 (Band C). The non-traditional construction of the blocks with regard thermal improvements is considered 'hard to treat'.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Temporary Accommodation Placement PolicyThe Cabinet Member for Housing (1) recognises the important role that temporary accommodation has in supporting peopl...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.