1.1The purpose of this report is to provide a progress review of the off-street electric vehicle chargepoint trial.
Recommendations
It is recommended that the Cabinet Member for Traffic and Transportation approves:
2.1Progress of the off-street electric chargepoint trial is noted;
2.2The off-street electric chargepoint trial is extended for an additional year in its current form ending on 29 January 2021.
Background
3.1Portsmouth is subject to a Ministerial Directive to deliver a citywide Local Air Quality Plan to bring forward compliance for nitrogen dioxide emissions in the shortest possible timescales. A targeted feasibility study identified a combination of measures which would bring forward compliance, one of which was the rollout of electric vehicle charging points both on and off street to encourage Electric Vehicle (EV) ownership.
3.2There has been an increase in the number of plug-in electric vehicles. There has been an increase in the number of plug-in electric vehicles (EVs), including cars, quadricycles and Light Goods Vehicles (LGVs), registered in Portsmouth since the commencement of this trial. At the end of 2017, there were 1,033 EVs registered in the city. The latest information from the Government website (www.gov.uk) shows that this has increased to 2,025 as at September 2019, representing a 96% increase. Further figures show the number of registered EVs in the city at the end
1 www.portsmouth.gov.uk of 2018 represent a little over 1.35% of 'like for like' vehicles - an encouraging trend given the 0.86% share at the end of 2017.
3.3The growth in EV vehicles registered locally follows the upward trend in electric vehicle ownership in England. The Department for Transport (DfT) and the Driver and Vehicle Licensing Agency (DVLA) figures (provided by the ONS) show that 98,648 new EVs were registered in the UK between Q4 2017 and Q3 2019 - an increase of 75%.
3.4Whilst the increased uptake in ULEVs (Ultra Low Emission Vehicles) in Portsmouth is a positive step towards reaching the ambitions of the Government's Road to Zero strategy, the council acknowledges that without sufficient EV charging infrastructure in the city, further uptake of ULEVs is likely to be limited.
3.5Providing infrastructure to enable the charging of electric vehicles for public use is an essential first step in encouraging the transition to electric vehicles. In December 2019, the council was awarded £229,860 for 75% of capital costs for phase 2 of the On-street Residential Chargepoint Scheme (ORCS). This scheme allows residents to charge their vehicles whilst at home. Following the announcement of this funding, the ORCS scheme will be developed further, and presented in a separate report to the Traffic and Transportation Cabinet meeting.
3.6Prior to the implementation of this trial, Portsmouth City Council provided a publicly accessible dual chargepoint at the Portsmouth park and ride site. This chargepoint is stand alone and is not linked to the chargepoints within this trial.
3.7On 17th July 2017, a detailed report was presented and approved by the Cabinet Member for Traffic and Transportation, which outlined the intentions of this scheme and considered the possible chargepoint locations.
3.8The off-street EV chargepoint trial was designed to promote electric vehicles as a viable choice through providing necessary charging infrastructure for residents and visitors. This report will inform the strategy being developed for other Portsmouth City Council owned off street locations including upgrading the park and ride provision with consideration of other pay and display car parks, business parks and leisure sites.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.