CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Portsmouth City Council
Traffic & Transportation, Monday 17 July 2017 at 4.00pm

Off Street Electric Vehicle Chargepoint Trial

Approved Committee 1 paper

Traffic & Transportation approved this item on Monday 17 July 2017. Below is the council's own wording, with the papers it was decided on.

Item9

Resolved

The Cabinet Member for Traffic and Transportation approved the trial for a two year period, with a progress report to be brought back after a year.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Traffic & Transportation

Purpose of report

1.1The purpose of this report is to seek approval for the trial of electric vehicle chargepoints in selected PCC owned off-street car parks.

Recommendations

2.1It is recommended that the Cabinet Member for Traffic and Transportation approves the trial for a two year period, with a progress report to be brought back after a year.

Background

3.1Currently, there is a low level of take up in the city of electric or hybrid vehicles. Just 0.07% (74 no) of cars registered in Portsmouth are electric, and 6.81% (6,870) are hybrid. This echoes the national picture where only 0.1% of cars registered in the UK in 2015 were electric vehicles.

3.2There is however, a clear, increasing trend in electric vehicle ownership. The Department for Transport (DfT) figures show over 13,800 new ultra-low emissions vehicles (ULEVs) were registered in the UK in the quarter Jan - Mar 2017, highlighting an increase of 17% on the same period last year.

3.3Providing infrastructure to enable the charging of electric vehicles in public and residential areas is an essential first step in enabling the transition to electric vehicles.

3.4Portsmouth City Council only has one publically accessible dual chargepoint in the city at the Park and Ride site at Junction 1 of M275 in Tipner. This chargepoint is stand alone and not part of a network. It is free to use and as such no usage data can be obtained.

1 www.portsmouth.gov.uk 3.5. In addition to this facility, there are four privately owned publically accessible chargepoints across the city. These are located at;

 Portsmouth Marriot Hotel - Cost: No fee, parking free

 North Harbour Unit Trust - Cost: No fee, parking free

 Crasswell Street NCP Car Park - Cost: Admin/connection fee £1.20 / £0.09 per kWh, parking costs apply

 Gunwharf Quays - Cost: Admin/connection fee £1.20 / £0.09 per kWh, parking costs apply

4. Off-street Electric Vehicle Chargepoint Trial

4.1The creation of a network of chargepoints across the city would serve residents and visitors and increase the uptake of electric vehicles in the city and in turn reduce vehicle emissions.

4.2This trial will promote electric vehicles as a viable choice through providing the basis of the necessary charging infrastructure for residents and visitors.

4.3A budget has been identified to help develop a network of chargepoints but this will need to be supplemented by external funding opportunities which would need to be identified if the network proved to be more extensive.

4.4CityEV are a Portsmouth based electric vehicle chargepoint supplier who until now have been focussing on the domestic and business market. Keen to get into the public chargepoint market, CityEV approached the city council regarding testing their product through a trial.

4.5The proposed chargepoint CityEV Cityline 100 is able to be attached to both columns or walls and as such provides wider choice of location options and lower installation costs.

4.6The Cityline 100 units have been approved for the Office for Low Emission Vehicles (OLEV) Homecharge and Workplace Charging Schemes. There is no similar approval process for public charging infrastructure although the minimum technical specification requirements would be considered to be the same and are very similar for the OLEV on-street residential chargepoint scheme.

4.7The trial would consist of one fast (7kW) chargepoint in prominent positions on existing infrastructure in each of the three locations;

 Clarence Esplanade, PO5 3AP  Isambard Brunel Multi-Storey, Alec Rose Lane, PO1 2BX  The Harbour Street Car Park, Hard Interchange PO1 3EQ 2 www.portsmouth.gov.uk These locations have been chosen for the necessary long dwell time of users and high level of usage.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Off Street Electric Vehicle Chargepoint TrialReport 158 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

2 of 3 attended
SB
Councillor Simon BosherCabinet Member, present
LS
Councillor Lynne StaggOpposition spokesperson, present
YC
Councillor Yahiya ChowdhuryOpposition spokesperson, absent

On this subject at Portsmouth

Search all
  1. Off Street Electric Vehicle Chargepoint TrialThis decision
  2. Off-street electric vehicle charge point trial - End of trial reviewNoted
  3. Off-Street electric vehicle charging point trial progress reportApproved
  4. Ferry Road, northern end off-street areas (non-public highway): TRO 36/2015Deferred
  5. Sign off of panel's report - 'Revitalising local high streets and secondary shopping areas in the city'Decided

More from Portsmouth Traffic & Transportation

All decisions
MeetingDecisionOutcome
23 Mar 2023 Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... Approved Open
23 Mar 2023 Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... Approved Open
23 Mar 2023 Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... Approved Open
23 Mar 2023 TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... Approved Open
23 Mar 2023 St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies