1.1The purpose of this report is to provide an update on the trial of the London Road Taxi Rank in North End following six months of operation.
2.1In September 2020, a review of Hackney Carriage stands was presented at the Licensing Committee and included a proposal for a 24-hour taxi rank on London Road, North End.
2.2A number of locations were considered and following site observations, assessment and feasibility including highways designs, road safety audits and engagement with key stakeholders, a final location and operating details were proposed.
2.3The proposed rank at the end of the bus lane close to the junction with Laburnum Grove (as shown in Appendix A) was approved at the Cabinet Member for Traffic and Transportation meeting on 18 March 2022. This recommended that the rank be introduced as a trial under an Experimental TRO (ETRO 87/2022) to allow for the rank to be monitored during its operation, for 22 hours a day (9am to 7am).
2.4Following the required technical work and stakeholder engagement, the ETRO (87/2022) came into effect 5 August 2022 and following the lining works and installation of signage, the rank was in operation from Tuesday 9 August 2022.
1 www.portsmouth.gov.uk THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Integrated Impact Assessments, Legal or Finance Comments as no decision is being taken)
2.5The trial is such that the southern section of the bus lane is not operational as a taxi rank between 7am and 9am to allow buses full use of the bus lane in this peak period - marked with a red 'X' on Appendix A.
2.6There is an existing night-time taxi rank located within the bus lane that operates between 7pm to 7am. This rank has remained operational during this trial - marked with a red line on Appendix A.
2.7Appendix B, outlines the technical engineer's drawing. This depicts the bus lane, the existing night-time rank, the trial 2 car taxi rank and the nearby junctions.
2.8A stage 1 / 2 Road Safety Audit was undertaken ahead of this trial going live. A detailed design was provided to the independent auditor which included the measurements and proposed operating hours. The issued report outlined that there were "No problems identified".
3. Monitoring the trial taxi rank
3.1Ahead of proposing this location for the trial, there were a number of considerations on the impact on the immediate area and other road users and as such were areas to be monitored throughout the trial: • Bus delays due to traffic waiting to turn into Derby Road • The turning movements required by buses exiting the bus lane and navigating the taxis present in the rank, especially if queueing vehicles are present waiting to turn into Derby Road • London Road being the highest cycle casualty route in Portsmouth • Bus lanes are shared with cyclists and rental e-scooters • Over-ranking by taxis or non-taxis stopping in the rank.
3.2Data gathering and monitoring was carried out prior to installation and following installation to ensure the impact on user groups was measured.
3.3Bus delays There are two bus operators in Portsmouth, First and Stagecoach, both have services using this stretch of highway.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
London Rd Taxi Rank: Location MapAppendix A | 669 KB | Download |
PDF |
London Rd Taxi Rank: DesignAppendix B | 356 KB | Download |
PDF |
London Rd Taxi Rank Trial: 6 month update: Info onlyReport | 244 KB | DownloadRead as text |
Follow Traffic & Transportation at Portsmouth and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Mar 2023 | Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... | Approved | Open |
| 23 Mar 2023 | Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... | Approved | Open |
| 23 Mar 2023 | Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... | Approved | Open |
| 23 Mar 2023 | TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... | Approved | Open |
| 23 Mar 2023 | St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.