CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Portsmouth City Council
Traffic & Transportation, Thursday 23 March 2023 at 2.00pm

London Road Taxi Rank Trial - 6 month review

Noted Committee 3 papers

Traffic & Transportation noted this item on Thursday 23 March 2023. Below is the council's own wording, with the papers it was decided on.

Item24

Resolved

Decision The Cabinet Member noted the report which was for information only.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Traffic & Transportation

Purpose of report

1.1The purpose of this report is to provide an update on the trial of the London Road Taxi Rank in North End following six months of operation.

Background

2.1In September 2020, a review of Hackney Carriage stands was presented at the Licensing Committee and included a proposal for a 24-hour taxi rank on London Road, North End.

2.2A number of locations were considered and following site observations, assessment and feasibility including highways designs, road safety audits and engagement with key stakeholders, a final location and operating details were proposed.

2.3The proposed rank at the end of the bus lane close to the junction with Laburnum Grove (as shown in Appendix A) was approved at the Cabinet Member for Traffic and Transportation meeting on 18 March 2022. This recommended that the rank be introduced as a trial under an Experimental TRO (ETRO 87/2022) to allow for the rank to be monitored during its operation, for 22 hours a day (9am to 7am).

2.4Following the required technical work and stakeholder engagement, the ETRO (87/2022) came into effect 5 August 2022 and following the lining works and installation of signage, the rank was in operation from Tuesday 9 August 2022.

1 www.portsmouth.gov.uk THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Integrated Impact Assessments, Legal or Finance Comments as no decision is being taken)

2.5The trial is such that the southern section of the bus lane is not operational as a taxi rank between 7am and 9am to allow buses full use of the bus lane in this peak period - marked with a red 'X' on Appendix A.

2.6There is an existing night-time taxi rank located within the bus lane that operates between 7pm to 7am. This rank has remained operational during this trial - marked with a red line on Appendix A.

2.7Appendix B, outlines the technical engineer's drawing. This depicts the bus lane, the existing night-time rank, the trial 2 car taxi rank and the nearby junctions.

2.8A stage 1 / 2 Road Safety Audit was undertaken ahead of this trial going live. A detailed design was provided to the independent auditor which included the measurements and proposed operating hours. The issued report outlined that there were "No problems identified".

3. Monitoring the trial taxi rank

3.1Ahead of proposing this location for the trial, there were a number of considerations on the impact on the immediate area and other road users and as such were areas to be monitored throughout the trial: • Bus delays due to traffic waiting to turn into Derby Road • The turning movements required by buses exiting the bus lane and navigating the taxis present in the rank, especially if queueing vehicles are present waiting to turn into Derby Road • London Road being the highest cycle casualty route in Portsmouth • Bus lanes are shared with cyclists and rental e-scooters • Over-ranking by taxis or non-taxis stopping in the rank.

3.2Data gathering and monitoring was carried out prior to installation and following installation to ensure the impact on user groups was measured.

3.3Bus delays There are two bus operators in Portsmouth, First and Stagecoach, both have services using this stretch of highway.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
London Rd Taxi Rank: Location MapAppendix A 669 KB Download
PDF
London Rd Taxi Rank: DesignAppendix B 356 KB Download
PDF
London Rd Taxi Rank Trial: 6 month update: Info onlyReport 244 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

2 of 3 attended
LS
Councillor Lynne StaggCabinet Member, present
GH
Councillor Graham HeaneyOpposition spokesperson, present
SP
Councillor Scott Payter-HarrisOpposition spokesperson, apologies

On this subject at Portsmouth

Search all
  1. London Road Taxi Rank Trial - 6 month reviewThis decision
  2. London Road Taxi Rank - Experimental Traffic Regulation Order 87/2022Approved
  3. Proposed Taxi Rank on London Road, North EndDecided
  4. 19/00018/FUL - Land to rear of 118 London Road, Portsmouth, PO2 0LZAgreed
  5. 17/00111/FUL - 167-169 London Road Hilsea - Conversion of ground floor retail unit to provide 2no. 2 bed dwellings and 1no. 1 bed dwelling with external alterations to include removal of canopy and replacing shopfront with new windows and doors (re-submission of 16/01049/FUL) (report item 8)Refused
  6. 17/00338/FUL - Cornerstone House 120 London Road Portsmouth PO2 0NB - Conversion of part of ground floor to create 2 no. 1 bed self contained flats and an enlargement to the cycle storage area, with external alterations to include installation of new windows and doors (report item 1)Refused

More from Portsmouth Traffic & Transportation

All decisions
MeetingDecisionOutcome
23 Mar 2023 Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... Approved Open
23 Mar 2023 Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... Approved Open
23 Mar 2023 Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... Approved Open
23 Mar 2023 TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... Approved Open
23 Mar 2023 St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies