CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Portsmouth City Council
Transport, Thursday 12 October 2023 at 4.00pm

SEHRT City Centre South - design approval

Approved Committee 3 papers

Transport approved this item on Thursday 12 October 2023. Below is the council's own wording, with the papers it was decided on.

Item34

Resolved

Decision The Cabinet Member for Transport approved the City Centre South scheme.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Transport

NOTES: KEY:

COMM 1. DO NOT SCALE THIS DRAWING. IF IN DOUBT PLEASE REQUEST FURTHER GENERAL INFORMATION. SITE BOUNDARY

ERC 2. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.

IAL RO 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT PROPOSED KERB G CONTRACT DRAWINGS, CONSTRUCTION DETAILS AND SPECIFICATIONS. PROPOSED ROAD MARKINGS

AD G EXISTING BUS LANE PROPOSED CARRIAGEWAY CONSTRUCTION EXISTING FOOTWAY TO BE REGRADED TO SUIT DROPPED CROSSING G PROPOSED ISLAND (RED BLOCK PAVING) PROPOSED CYCLE LANE (GREEN SURFACE DRESSING) PROPOSED ASPHALT WITH YELLOW SURFACE DRESSING PROPOSED ASPHALT WITH RED SURFACE DRESSING Y ONL PROPOSED BLOCK PAVING TO MATCH EXISTING NG B ADI STA LO NHO G B B B B B B PROPOSED LOADING BAY BLOCK PAVING PE G ROA CB D G PROPOSED FOOTWAY BAND OF 100mm X 100mm GRANITE SETTS PROPOSED FOOTWAY PAVING

STATION PROPOSED FOOTWAY PAVING (FULL DEPTH) STREET CB EXISTING WARNING PAVING TO REMAIN CB G CB PROPOSED TACTILE PAVING PROPOSED CORDUROY PAVING G G G PROPOSED SPEED HUMP REFER TO SD49904_2002_SD01 G G PROPOSED HISTORIC BUS INSPECTORS KIOSK – SUBJECT TO S2 PLANNING PERMISSION (NOT PART OF CCS SCHEME) CB EXISTING FENCE TO REMAIN G PROPOSED FENCE TO BE INSTALLED RELOCATED METAL FENCE B PROPOSED BOLLARD REFER TO SD49904_2002_SD03 RB PROPOSED REMOVABLE BOLLARD REFER TO SD49904_2002_SD03

POLICE G DRAINAGE G EXISTING GULLY TO REMAIN G EXISTING GULLY TO BE REBUILT TO SUIT PROPOSED SURFACE LEVELS G PROPOSED GULLY TO BE INSTALLED B EXISTING CHAMBER/MANHOLE SIGNAGE or EXISTING SIGN TO REMAIN EXISTING ILLUMINATED SIGN TO REMAIN 0 5 10 EXISTING SIGN TO BE RELOCATED FOR CONTINUATION SEE BELOW metres or EXISTING SIGN TO BE REMOVED AND REPLACED

AYS TH W CB

K BO EXISTING COLLAPSIBLE BOLLARD TO REMAIN

LOO B

D PROPOSED SIGN POST

L ROA CB PROPOSED COLLAPSIBLE BOLLARD

RUNE IB PROPOSED ILLUMINATED BOLLARD

ARD B B STREET LIGHTING

ISAMB B B EXISTING LIGHTING COLUMN TO REMAIN EXISTING LIGHTING COLUMN TO RELOCATED EXISTING LIGHTING COLUMN TO REMAIN LUMINAIRE TO CHANGE PROPOSED LIGHTING COLUMN LOCATION PROPOSED TRAFFIC SIGNAL BIKE STAND TO BE RELOCATED

BIKE STAND TO BE RETAINED G

P04 FOR PRICING 19.04.23 ENO GR GR

P03 RESPONSE TO PCC COMMENTS 06.01.23 RG SH GR FOR CONTINUATION SEE ABOVE

P02 WORKSHOP 2 14.11.22 RG LC GR COMM ERCIA G B

L ROA Mark Revision Date Drawn Chkd Appd D SCALING NOTE: Do not scale this drawing - any errors or omissions shall be reported to Stantec without delay. UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this drawing is believed to be correct, but no warranty to this is expressed or implied. Other such plant or apparatus may also be present but not shown. The Contractor is therefore advised to undertake their own investigation where the presence of any existing sewers, services, plant or apparatus may affect their operations. S3

B B B Drawing Issue Status B B B FOR PRICING 20

G

PORTSMOUTH TCF SCHEMES T EAS E RD

D S1

ISAMB LAK

CIAL R ARD B RUNEL ROAD CITY CENTRE SOUTH

ER COMM A3 ER D WE ST PROPOSED GENERAL ARRANGEMENT LAK LOADING

A3 RB

A20 G Client RB

30 RB CASCADES SHOPPING

RD CENTRE RB RB

ED RB RB

FR AL ARUNDEL ST STATION ST Date of 1st Issue Designed Drawn stantec.com/uk A3

18.08.22 SB RG ISAM A1 Scale Checked Approved e e e BRUN BARD The copyrights to all designs and drawings are the property of Stantec. EL RD 1:250 SB GR Reproduction or use for any purpose other than that © Crown copyright and database rights 2019 . Unauthorised reproduction authorised by Stantec is forbidden. 0 5 10 Drawing Number Revision infringes Crown copyright and may lead to prosecution or civil proceedings. metres READING 49904/2002/0100 P04 Ordnance Survey 100019180 Tel: 01189 500 761

user name: roseff, georgina File Location: \\cbh-vfil-001\cbh\projects\49904 portsmouthcc tcf - city centre south\2000 - civils\design\cad\dwgs\2002 - ta\49904_2002_0100 - general arrangement.dwg

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
49904_2002_0100-P04-General ArrangementReport 1.4 MB DownloadRead as text
PDF
SEHRT City Centre South Cabinet approve design: FINALReport 201 KB Download
PDF
Updated IIA SEHRT City Centre South Cabinet approve designReport 111 KB Download

At this meeting

Whole meeting

Who was there

4 of 4 attended
GV
Councillor Gerald Vernon-Jackson CBECabinet Member, present
SB
Councillor Simon BosherOpposition spokesperson, present
GH
Councillor Graham HeaneyOpposition spokesperson, present
BM
Councillor Brian MadgwickOpposition spokesperson, present

More from Portsmouth Transport

All decisions
MeetingDecisionOutcome
1 Jul 2026 Proposed time-limited parking place - New Road - TRO Ref P055-25DECISION The Cabinet Member for Transport approved the proposed time-limited parking place as advertised on New Road. Approved Open
1 Jul 2026 Exeter Road EV Bay: THE PORTSMOUTH CITY COUNCIL (VARIOUS ROADS)(ELECTRIC VEHICLE RECHARGING PARKING PLACES)(NO.6) ORDER 2026 (Ref.P004-2026)DECISION The Cabinet Member for Transport approved the implementation of Traffic Regulation Order Reference P004-2026... Approved Open
1 Jul 2026 Residents Parking Zones Future ProgrammeDECISION The Cabinet Member for Transport: 1. Approved progressing the RPZs Future Programme for proposed new zones a... Approved Open
1 Jul 2026 Review of Parking TariffsDECISION The Cabinet Member for Transport: 1. Approved the metered parking tariffs to be increased as set out in appe... Approved Open
1 Jul 2026 Updated Portsmouth Transport Implementation Plan and Local Transport Delivery Plan 2026/27 - 2029/30DECISION The Cabinet Member for Transport: 1. Approved the proposed Portsmouth Transport Implementation Plan 2026/27 ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies