That ( i ) the building condition survey report and minimum estimated costs of bringing the structure and components up to a modern standard shown in Appendix A, be noted. (ii) the financial and cost/benefit analysis that demonstrates the costs of borrowing to fund major works combined with the costs of running the building cannot be realistically offset by the income from the current use of the building, even if both charges and usage increased three-fold, as shown in Appendix B, be noted. (iii) the potential relocation of hirers set out in Appendix C, be noted. (iv) the results of public consultation summarised in Appendix D, be noted. (v) the Equalities Impact Assessment set out in Appendix E, be noted. (vi) the use and redevelopment options appraisal set out in Appendix F including the outline business case for alternative use by the Education department in the People Directorate, be noted. (vii) to close the building to hirers from 15 October 2023 and work with Vision RCL to relocate as many as possible to alternative venues, be agreed. (viii) the relocation of the Kids In Charge provision to Nightingale Primary School from 1 September 2023, be noted. (ix) to the Corporate Director of Regeneration and Culture taking back control of the building from Vision RCL and working with the Education department to produce a full business case for conversion of the site for alternative use, including seeking to offer some continued community use, to be brought back to Cabinet for consideration, be agreed. (Councillor Coomb declared an interest in this item and left the Chamber)
Word for word from the decision Redbridge published for this meeting.Source: moderngov.redbridge.gov.uk
Contents Executive Summary .............................................................................................................................. 1 Introduction ........................................................................................................................................... 1 The Property ....................................................................................................................................... 1 Scope of Instruction .......................................................................................................................... 1 Inspection .......................................................................................................................................... 1 Documentation Received ............................................................................................................... 2 Description & Assessment of Condition .............................................................................................. 3 Overview ............................................................................................................................................ 3 Roofs ................................................................................................................................................... 3 Elevations ........................................................................................................................................... 6 Internal Areas .................................................................................................................................... 9 External Areas .................................................................................................................................. 13 Budget Costs........................................................................................................................................ 16 Significant Maintenance Liability Overview ................................................................................ 16 Sign Off ................................................................................................................................................. 17
Appendix A – Budget Costs For Works Appendix B – Michael Jones & Associates LLP – Report Upon Building Services Appendix C - Report Limitations
Issue 1 Executive Summary Key High Risk Critical issue requiring urgent attention with significant health & safety, statutory and/ or cost implications.
Medium Risk Significant issue requiring action in the short to medium term and/or has notably cost implication.
Low Risk Item for information/ advisory purposes or requiring action in the long term.
Overall Summary Wanstead Youth Centre, 144 Elmcroft Avenue, London E11 2BD (the Property) comprises a single storey building that is primarily used as a children’s nursery, youth centre, sports hall and function hall.
We believe the main building was constructed in the 1960’s although there have been various alterations and additions including a 1980’s built sports hall.
The Property is not listed and it is not in a Conservation Area.
From a building surveying perspective, we consider the Property to be in generally poor to fair condition with a backlog of routine maintenance and internal modernisation required. Furthermore, some elements of the building have reached the end of their serviceable life and require replacement. Consideration should also be given to upgrading thermal elements such as roofs, windows and walls to improve the thermal efficiency of the building.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.