RESOLVED THAT COMMITTEE: 1. Approve the move of the Joiners Arms Roof Renewal capital scheme from the 2023/24 capital programme to the 2021/22 capital programme, with a revised budget of £42,200, and refer this to Policy and Finance Committee for final approval. 2. Approve a new capital scheme for the renovation of flats 1 and 2 at Joiners Arms, with a budget of £13,540 funded from the Flexible Homelessness Support Grant earmarked reserve and refer this to Policy and Finance Committee for final approval. 3. Agree that work to re-render the rear elevation is undertaken as part of the roof renewal project and included in the tender specification as an addition to the capital scheme in the interests of efficiency, subject to the costs returned from the tender process.
Word for word from the decision Ribble Valley published for this meeting.Source: democracy.ribblevalley.gov.uk
2.1The Joiners Arms located at 90 Whalley Road, Clitheroe is the Council’s homeless hostel. The unit provides a mix of self contained and shared facility flats to provide emergency temporary accommodation for those in need. The premises were taken back into Council management in 2017 following the ending of the previous agreement with Ribble Valley Homes (Onward) who managed the site for the previous 9 years.
2.2Since being in Council management, repairs, maintenance and refurbishments have been undertaken to keep the building compliant and operationally fit for purpose. This has generally been ongoing maintenance and repairs, however the need to replace the roof was identified as a significant project out of the capital programme.
3. ROOF RENEWAL AND RENOVATION WORKS
3.1Members will be familiar with the scheme in the current capital programme to re-roof the building. The relevant programme schedule is included at Appendix 1 to this report. This was initially programmed to be undertaken in the financial year 2023/24 at an estimated cost of £43,900, inclusive of an inflation uplift.
3.2Recent adverse weather events and considerable, accelerated deterioration of the roof fabric has meant it is now a matter of some urgency that the re-roofing is undertaken. Consequently, Members are asked to approve the movement of the roof renewal capital scheme from the year 2023/24 to 2021/22 to enable the works to proceed. Bringing forward the scheme will reduce the scheme budget to £42,200, to reflect less inflation uplift. 3.3 In addition, at present two flats have had to be taken out of service as a result of damp and water ingress. The ceiling in flat 2 has collapsed as a result of water damage. Unfortunately, these units are two of the larger self-contained family flats which brings pressure on the service to accommodate users who need these larger units to meet their needs. Whilst temporary measures could be taken to mask the effects of damp in flat 1, without the roof renewal such measures would simply be a stop gap.
3.4As Members will recall, most of the flats have been refurbished and renovated over a number of years to maintain a basic standard, however flats 1 and 2 have not had this work undertaken in part due to the damp. As well as dealing with the damp issues, these units also require redecoration, replacement of damaged and dangerous flooring, and kitchen renovations to flat 1 where the kitchen units are damaged and cannot be maintained to clean and hygienic standard.
3.5The table below indicates the key renovation work needed to bring these two flats into service.
Flat 1
Strip out existing kitchen supply and install new contract kitchen, £3,615.00 re-tile splashbacks and supply and install new 7L water heater.
Strip walls of existing paper and re-paper with lining paper. £1,450.00
Remove existing laminate flooring and replace with a suitable vinyl £2,335.00 floor with weld joints. Flat 1 Total £7,400.00
Flat 2
Strip walls of existing paper and re-paper with lining paper. £1,500.00
Re-plaster to ceiling and wall in lounge area. £2,300.00
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Public Health Act Funerals PolicyRESOLVED THAT COMMITTEE: 1. Approve the proposed policy ‘Public Health Act Funerals Policy/Procedure. 2. Permit the H...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.