CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Ribble Valley Borough Council
Planning and Development, Thursday 1 June 2023 at 6.30pm

3/2022/1039 - Land adj Kemple View, Clitheroe BB7 2QJ

Decided Planning 1 paper

Planning and Development decided this item on Thursday 1 June 2023. Below is the council's own wording, with the papers it was decided on.

Item32

Resolved

RESOLVED THAT COMMITTEE: 1. Grant planning permission (contrary to the recommendation) subject to conditions. 2. The application is to be brought back to a future committee meeting for decision with conditions drafted.
Word for word from the decision Ribble Valley published for this meeting. Source: democracy.ribblevalley.gov.uk

Follow this further

Built from Ribble Valley's papers

What the report saysPro

Report to Planning and Development

RECOMMENDATION FOR PLANNING AND DEVELOPMENT COMMITTEE

REFUSAL

DATE: 1 June 2023 REF: SK CHECKED BY: LH

APPLICATION REF: 3/2022/1039

GRID REF: SD 373384 440661

DEVELOPMENT DESCRIPTION:

PROPOSED CONSTRUCTION OF TWO NEW DETACHED DWELLINGS WITH ASSOCIATED ACCESS AND GARDEN AREAS. RESUBMISSION OF 3/2021/1263. LAND ADJACENT TO 115 KEMPLE VIEW, CLITHEROE BB7 2QJ. CONSULTEE RESPONSES/ REPRESENTATIONS MADE:

PARISH COUNCIL:

No representations received in respect of the application.

LANCASHIRE COUNTY COUNCIL (LOCAL HIGHWAYS AUTHORITY):

The level of car parking and turning areas are considered acceptable. There are no garages proposed. Each dwelling requires a secure, covered cycle store and electric vehicle charging point. The proposed highway drain diversion shown on drawing 'Site drainage diversion and proposed building outline' PHA/366-100 is acceptable.

Should consent be granted, the following conditions are requested:

• No development shall take place, including any works of demolition, until a construction method statement has been submitted to and approved in writing by the Local Planning Authority • Prior to commencement of any building works, the drainage diversion works shown on drawing 'Site drainage diversion and proposed building outline' PHA/366-100 shall be completed in accordance with Lancashire County Council Specification under an appropriate agreement with access right s agreed thereafter. • The new estate road shall be constructed in accordance with the Lancashire County Council Specification for Construction of Estate Roads to at least base course level before any development takes place within the site. • Prior to the first occupation of any dwelling, the car parking and turning areas shall be provided and maintained thereafter for the purposes of vehicle parking. • Prior to the first occupation each dwelling shall have an electric vehicle charging point. Charge points must have a minimum power rating output of 7kW, be fitted with a universal socket that can charge all types of electric vehicle currently.

UNITED UTILITIES (UU):

United Utilities have identified that a number of assets (public sewers) cross the site. Following review of the proposed site layout, along with the CCTV investigations of the sewer and the topographical survey, it appears that our required access to the public sewers are provided. Request that the submitted drainage easement, drainage diversion and building outline plans are listed as approved documents on any subsequent Decision Notice.

Further site-specific investigations would be needed to determine the precise location of United Utilities assets. Should consent be granted, UU have requested the following condition(s):

1. No construction shall commence until details of the means of ensuring the sewers that are laid within the site boundary are protected from damage as a result of the development have been submitted to and approved by the Local Planning Authority in writing. The details shall outline the potential impacts from construction activities and the impacts post completion of the development on the sewers that cross the site and identify mitigation measures to protect and prevent any damage to the pipelines both during construction and post completion of the development. Any mitigation measures shall be implemented in full in accordance with the approved details. 2. Prior to the commencement of development, details of a sustainable surface water drainage scheme and a foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The drainage schemes must include:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/2022/1039: Land adj Kemple View, Clitheroe BB7 2QJReport 345 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 23 attended
A(
Councillor Anthony (Tony) AustinCommittee Member, present
KB
Councillor Karl BarnsleyCommittee Member, present
SB
Councillor Susan BibbyChair, present
DB
Councillor Derek BrocklehurstCommittee Member, present
IB
Councillor Ian BrownCommittee Member, present
SB
Councillor Stella Brunskill JPCommittee Member, present
LE
Councillor Louise EdgeCommittee Member, present
SF
Councillor Stewart FletcherCommittee Member, present
MF
Councillor Mark FrenchCommittee Member, apologies
SH
Councillor Simon HoreCommittee Member, present
KH
Councillor Kevin Horkin MBECommittee Member, present
SO
Councillor Simon O'RourkeCommittee Member, present

All 23 on the meeting page

On this subject at Ribble Valley

Search all
  1. 3/2022/1039 - Land adj Kemple View, Clitheroe BB7 2QJThis decision
  2. 3/2022/1039 - Land adjacent to 115 Kemple View Clitheroe BB7 2QJRefused
  3. 3/2023/0305 - land at former Higher Standen Farm (adj Swardean Way Valley Lane Higher Peak Crescent South Gate Broadfield Street) Pendle Road Clitheroe BB7 1PRDeferred
  4. 3/2023/0767 - Land adj Rush Paddock Farm Osbaldeston Lane Osbaldeston BB2 7LYRefused
  5. Confirmation of TPO Order at Land Adj St Mary's Church, MellorDecided
  6. 3/2022/1039 Land adjacent 115 Kemple View Clitheroe BB7 2QJDeferred

More from Ribble Valley Planning and Development

All decisions
MeetingDecisionOutcome
27 Aug 2026 3/2025/0801 - Land to east of Salesbury View WilpshireRESOLVED THAT COMMITTEE: REFUSE PLANNING PERMISSION for the following reasons: 1. The proposed development would be o... Refused Open
27 Aug 2026 3/2022/0317 - Land at Higher Standen Farm and Part Littlemoor Farm ClitheroeRESOLVED THAT COMMITTEE: GRANT planning permission subject to the following condition(s): 1. Unless explicitly requir... Approved Open
27 Aug 2026 3/2026/0442 - Castle Museum Clitheroe Castle Castlegate Clitheroe BB7 1AZRESOLVED THAT COMMITTEE: GRANT planning permission subject to the following condition(s): The development hereby perm... Approved Open
27 Aug 2026 3/2025/0997 - Land off Henthorn Road Clitheroe BB7 3BYRESOLVED THAT COMMITTEE: Application deferred to enable an alternative access directly off Henthorn Road to serve the... Deferred Open
27 Aug 2026 3/2026/0230 - Land to the south of Ribblesdale Primary School west and north of Higher Standen DriveRESOLVED THAT COMMITTEE: DEFER AND DELEGATE to the Director of Economic Development and Planning for approval subject... Deferred Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies