RESOLVED THAT COMMITTEE: Refuse planning permission for the following reason(s): 1. The proposal is considered contrary to Policy DMG1 of the Ribble Valley Core Strategy insofar that the proximity, scale and orientation of ‘Building 2’ would significantly undermine and compromise the residential amenities of the occupiers of 115 Kemple View by virtue of a direct unsympathetic overbearing relationship. 2. The proposal is considered contrary to Policy DMG1 of the Ribble Valley Core Strategy in that the proximity, scale and orientation of ‘Building 1’ would significantly undermine and compromise the residential amenities of the occupiers of residential dwellings to the south-west by virtue of an overbearing relationship, exacerbated by the differing topographies between that of the application site and garden areas/land-levels associated with the existing affected dwellings. 3. The proposal is considered contrary to Policy DMG1 of the Ribble Valley Core Strategy and Paragraphs 130 and 134 of the National Planning Policy Framework insofar that approval of the proposal would result in the introduction of an anomalous and discordant pattern and form of development, that by virtue of the scale of the proposed dwellings, their inherent footprints and site configuration, would fail to respond positively to the inherent pattern and scale of adjacent built-form being of significant detriment to the character and visual amenities of the area.
Word for word from the decision Ribble Valley published for this meeting.Source: democracy.ribblevalley.gov.uk
RECOMMENDATION FOR PLANNING AND DEVELOPMENT COMMITTEE
REFUSAL
DATE: 24 JULY 2025 REF: SK CHECKED BY: LH
APPLICATION REF: 3/2022/1039
GRID REF: SD 373384 440661
DEVELOPMENT DESCRIPTION:
PROPOSED CONSTRUCTION OF TWO NEW DETACHED DWELLINGS WITH ASSOCIATED ACCESS AND GARDEN AREAS. RESUBMISSION OF 3/2021/1263. LAND ADJACENT TO 115 KEMPLE VIEW CLITHEROE BB7 2QJ. CONSULTEE RESPONSES/ REPRESENTATIONS MADE:
PARISH COUNCIL:
No representations received in respect of the application.
LANCASHIRE COUNTY COUNCIL (LOCAL HIGHWAYS AUTHORITY):
The level of car parking and turning areas are considered acceptable. There are no garages proposed. Each dwelling requires a secure, covered cycle store and electric vehicle charging point. The proposed highway drain diversion shown on drawing 'Site drainage diversion and proposed building outline' PHA/366-100 is acceptable.
Should consent be granted, the following conditions are requested:
• No development shall take place, including any works of demolition, until a construction method statement has been submitted to and approved in writing by the Local Planning Authority • Prior to commencement of any building works, the drainage diversion works shown on drawing 'Site drainage diversion and proposed building outline' PHA/366-100 shall be completed in accordance with Lancashire County Council Specification under an appropriate agreement with access right s agreed thereafter. • The new estate road shall be constructed in accordance with the Lancashire County Council Specification for Construction of Estate Roads to at least base course level before any development takes place within the site. • Prior to the first occupation of any dwelling, the car parking and turning areas shall be provided and maintained thereafter for the purposes of vehicle parking. • Prior to the first occupation each dwelling shall have an electric vehicle charging point. Charge points must have a minimum power rating output of 7kW, be fitted with a universal socket that can charge all types of electric vehicle currently.
UNITED UTILITIES (UU):
United Utilities have identified that a number of assets (public sewers) cross the site. Following review of the proposed site layout, along with the CCTV investigations of the sewer and the topographical survey, it appears that our required access to the public sewers are provided. Request that the submitted drainage easement, drainage diversion and building outline plans are listed as approved documents on any subsequent Decision Notice.
Further site-specific investigations would be needed to determine the precise location of United Utilities assets. Should consent be granted, UU have requested the following condition(s):
1. No construction shall commence until details of the means of ensuring the sewers that are laid within the site boundary are protected from damage as a result of the development have been submitted to and approved by the Local Planning Authority in writing. The details shall outline the potential impacts from construction activities and the impacts post completion of the development on the sewers that cross the site and identify mitigation measures to protect and prevent any damage to the pipelines both during construction and post completion of the development. Any mitigation measures shall be implemented in full in accordance with the approved details. 2. Prior to the commencement of development, details of a sustainable surface water drainage scheme and a foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The drainage schemes must include:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.