AI summaryRibble Valley councillors split solar panels from the Ribblesdale Pool refurbishment contract and asked officers to find the best separate option for cutting carbon and electricity costs.
Written from the decision and the officer reportPDF Pro
OutcomeAgreedSeparate proposal to follow
Money£133,000 extra, £147,000 contingencySection 106 and project contingency
What happens nextOfficers to develop separate proposalFuture committee report expected
Who it affectsRibblesdale Pool users and operatorsOnly public pool in the borough
What was decided
Committee agreed the solar panel element should be removed from the current contract and considered separately, with no delay to the pool reopening.
Committee resolved that the solar PV element not be progressed as part of the pool project with Alliance, and that a separate proposal be developed by officers to achieve the maximum possible reduction in carbon dioxide and electricity costs for the Council regardless of location.
Why
The pitched roof cannot structurally support PV panels, only its covering has been replaced, and the flat roof option failed because the council's insurers required a non-flammable membrane that the contractor could not accommodate within the structure's weight loading. Report 3.3
Reducing running costs, especially the high energy costs of heating water and air, is essential to secure the pool's future operation, and cutting carbon was a committee priority. Report 3.1
What happens next
Officers will develop a separate proposal for solar PV or other measures to cut carbon dioxide and electricity costs, to be considered by committee in a future report.
The main pool refurbishment continues, with completion not dependent on the solar element being decided now. Report 2.2
The money
over £4m Council commitment to refurbish Ribblesdale Pool Report 2.1
£133,000 Additional funding allocated at Emergency Committee on 23rd July from a Section 106 commuted sum for leisure improvements in Clitheroe Report 2.5
£147,000 Client held contingency in the original budget to cover risks of renovating an older building Report 2.5
Options considered
Rejected: Install PV panels on the pitched roof. Roof structure lacks the structural integrity to support the weight, only the covering has been replaced
Rejected: Install PV panels on the flat roof. Insurers require a non-flammable membrane which the contractor cannot fit within the acceptable weight loading, and extra costs make the scheme unviable Report 3.3
Rejected: Install a ground array to the front of the building protected by a fence. Set aside; the committee removed solar PV from the current contract to consider it separately Report 3.4
Rejected: Build a structure over the driveway or on the car park opposite, or use the grassed area in front of the padel centre. None proved viable, largely due to the cost of providing underground connections Report 3.4
Implications
Financial: Funding for PV panels on the roof was previously agreed and budgeted; the chosen solution is expected to be accommodated within the available budget, though final costs are awaited. Report P12, 3.5
Risk: Reopening the pool without the additional investment agreed at emergency committee and without solar panels risked a negative perception of the overall scheme. Report P15
Other: Installing PV on a high-energy building was a political priority; the alternative ground-based solution is the best achievable given the insurance difficulties. Report P14
Equalities: The PV proposal will have no material impact on equality and diversity. Report P16
Who and where
Users of Ribblesdale Pool, the only public swimming pool in the borough Report 2.1
Residents of Clitheroe, the named beneficiaries of the Section 106 commuted sum from the Standen development Report 2.5
Alliance, the contractor carrying out the refurbishment Report 3.3
April 2026: Refurbishment works commenced Report 2.2
23rd July: Emergency Committee allocated additional £133,000 from Section 106 Standen commuted sum Report 2.5
2026-08-25: Community Services Committee decided to remove solar PV from the contract
Following completion of the refurbishment: Any separately approved solar installation is likely to take place then, as planning permission will be needed Report 3.4
Plain English for the jargon
PV panels: Photovoltaic solar panels that generate electricity from sunlight
Section 106 commuted sum: A payment made by a developer to a council under a planning obligation, here from the Standen development for leisure improvements in Clitheroe
Client held contingency: Money set aside within the project budget to cover risks and unforeseen costs
Ground array: A set of solar panels mounted on a frame at ground level rather than on a roof
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item223
Resolved
It was agreed that the solar panel element should be removed from the current contract and considered separately. This would not delay the reopening of the pool, and officers would develop further proposals for consideration by Committee in a future report. RESOLVED THAT COMMITTEE: That the solar PV panel element not be progressed as part of the pool project with Alliance and instead a separate proposal be developed by officers to achieve the maximum possible reduction in Carbon Dioxide and electricity costs for the Council regardless of location.
Word for word from the decision Ribble Valley published for this meeting.Source: democracy.ribblevalley.gov.uk
2.1Ribblesdale Pool was built in 1972 and is now 54 years old. It is the only public swimming pool in the Borough. The council has committed to spend over £4m for an extensive refurbishment of the building to secure its’ future operational life.
2.2This work commenced in April 2026 and is progressing well. A recent visit by members of this committee illustrated the extent of the works. The full strip out of the old equipment in the plant room and the installation of new fittings has commenced.
2.3On the poolside the old air handling unit has been removed and the pool depth at the deep end has been reduced by approximately 1m. This latter alteration will contribute significantly in reducing the overall cost of running the pool. The pool itself will continue to be subsided as most swimming pools are, however much of the work being undertaken will help to make it more efficient, despite the fact the basic structure itself will still be 54 years old this year.
2.4The installation of new boilers and micro filtration will reduce the energy required to heat the pool and the building along with reducing the volume of chemicals and water required for the pool’s operation.
2.5Committee will note that at Emergency Committee, on 23rd July, additional funding of £133,000 was allocated to the pool project. The funding is one of the six tranches of Section 106 commuted sum from the Standen development. This commuted sum is for improvements of leisure facilities in Clitheroe. A client held contingency of £147,000 was agreed in the original budget, to provide for risks in renovating a building of this age. There is now greater certainty regarding those risks. The works to the roof structure have now advanced to a stage where it has been confirmed that it will not require additional work above that planned and costed. This certainty has allowed us to allocate a portion of the contingency to the costs of the project.
3 ISSUES
3.1The running costs of a pool are considerable, not least due to the high amount of energy required to heat the water and air in the building. To secure the future operation of the pool it is essential to minimise its running costs. Many design decisions have been taken to reduce running costs, and this was a key aim in the original brief set by committee. As part of this brief it was a priority to include solar panels as part of the project. This has been investigated thoroughly with the design team over a number of months. Unfortunately, there are a number of issues with the installation on the building. 3.2 The basic structure of the pitched roof has not been changed, only the covering. Therefore, it is not possible to place PV panels on that roof, because it does not possess the structural integrity to support the weight.
3.3It had been hoped to install PV panels on the flat roof part of the pool, however following prolonged discussions with the contractor and the council’s insurers, it has not been possible to reach an agreement on this. The Council’s insurers require an non-flammable membrane on the flat roof if the solar panels are to be placed there. The contractor is unable to accommodate the membrane and the PV panels within the acceptable weight loading of the structure. The additional costs incurred would also make the scheme unviable from a return on investment perspective.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Former Bowling Green, LongridgeRESOLVED THAT COMMITTEE: 1. Approve in principle the Council entering into a licence to occupy with Longridge Town Co...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.