That option 3(b), as detailed at paragraph 1.2 of the submitted report, in the sum of £16,285.05, be approved for the improvement works at , to ensure the requirements put forward by the Council’s Planning and Environmental Health Services are met.
Word for word from the decision Rochdale published for this meeting.Source: democracy.rochdale.gov.uk
1.1Wardle Football Club has plans to extend the lower pitch from a junior size to an adult/open age sized pitch and to improve the drainage which must comply with the Football Association Charter Standard Programme. A planning application was submitted at the same time as the scheme was put out to tender.
During the planning process, officers had concerns that there was a risk of waste material being brought to the surface by bioturbation (mixing of materials by the actions of soil organisms and growth of plant roots). To prevent bioturbation between the existing landfill material and the proposed pitch surface, a suitable separation layer has been added in the interest of protecting human health and to provide a better playing surface.
Options
The options for the geotextile material include: a. A non-woven geotextile, suitable to prevent bioturbation, coloured to provide a visual warning of underlying contaminated material. b. A non-woven geotextile, suitable to prevent bioturbation, standard (identical specification). Quotes for the design options for the separation layer and suitable geotextile have been sought from the appointed contractor, based on an area to be covered by the separation layer (pitch and runoff and surroundings) of 9445.7 m2. The total costs of the options include:
Option 1: A non-woven geotextile, suitable to prevent bioturbation, overlain by 50mm depth washed, clean gritstone (no fine material). a. 9445.7 M2 Terram T1000 Hi Viz Geotextile £14,357.46 6-14mm clean Limestone to a depth of 50mm £26,649.06 £41,006.46
b. 9445.7 M2 Terram T1000 Standard Geotextile £11,145.93 6-14mm clean Limestone to a depth of 50mm £26,649.06 £37,794.99 Option 2: A non-woven geotextile, suitable to prevent bioturbation, overlain by additional 50mm depth topsoil (i.e. 100mm topsoil buffer between the geotextile and slit drainage) a. 9445.7 M2 Terram T1000 Hi Viz Geotextile £14,357.46 Additional topsoil to a depth of 50mm £22,726.59 £37,084.05
b. 9445.7 M2 Terram T1000 Standard Geotextile £11,145.93 Additional topsoil to a depth of 50mm £22,726.59 £33,872.52
Option 3: A non-woven geotextile, suitable to prevent bioturbation, overlain by 300mm topsoil as specified, with an amended drainage system comprising 200mm slit drainage and additional 50mm blinding to underground piped drainage system (i.e. 100mm topsoil buffer between the geotextile and slit drainage). a. 9445.7 M2 Terram T1000 Hi Viz Geotextile £14,357.46 Amended drainage systems (primary & secondary) £5,239.12 Reduced depth of slit drainage Additional blinding to lateral drains £19,596.58
b. 9445.7 M2 Terram T1000 Standard Geotextile £11,145.93 Amended drainage systems (primary & secondary) £5,239.12 Reduced depth of slit drainage Additional blinding to lateral drains £16,385.05
Recommendation
2.1It is recommended that that option 3b is approved for funding to ensure the requirements put forward by the Planning Department’s Environmental Health Senior Officer are met.
Reason for recommendation
3.1To ensure the sufficient funding is made available for the additional requirement to meet planning requirements.
3.2Remove the risk of any pitch users and to mitigate any health and safety concerns.
3.3Option 3b has met the requirement of the Environmental Health Officer. Costs were saved by exhausting a number of options which still met those requirements.
3.4Future maintenance regimes will benefit from the 300mm topsoil above the separation barrier understanding there should be no impact of disturbance of waste material. 4. Key Points for Consideration
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Pennines Township Funds 2026/27That the expenditure, commitments and balances for Pennines Township revenue and capital funds in Appendix 1 and 2 to...
Pennines Township Appointments 2026-27That the Terms of Reference (as in Appendix 1 to the report) of the Township Committee be noted; 2. That the appointm...
Pennines Township Funds 2026/27That the expenditure, commitments and balances for Pennines Township revenue and capital funds in Appendix 1 to the r...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.