Item26
Resolved
Resolved :- (1) That the application be referred to the Office of the Deputy Prime Minister as a departure. (2) That consequent on the Office of the Deputy Prime Minister not wishing to intervene, planning permission be granted subject to the following conditions:- 1. Before the commencement of the development, details of the siting , design and external appearance of the building(s), the means of access thereto and the landscaping of the site shall be submitted to and approved by the Local Planning Authority and the development shall be carried out in accordance with the approved details. 2. No development shall take place until samples of the materials to be used in the construction of the external surfaces of the development, hereby permitted, have been submitted to, and approved in writing by, the Local Planning Authority and the development shall be carried out in accordance with the approved details. 3. Before the development is brought into use, that part of the site to be used by vehicles shall be properly drained and constructed in concrete, tarmacadam , block paving or other such material as may be agreed by the Local Planning Authority. 4. Surface water from areas likely to receive petrol/oil contamination (e.g. vehicle parking areas) shall be passed through effective oil/grit interceptors prior to the discharge to any sewer or watercourse. 5. Details of the means of disposal of foul, and surface water drainage, including details of any off-site works, shall be submitted to and approved by the Local Planning Authority. The proposals shall include sustainable urban drainage techniques to tackle surface water run-off at source and the development shall not be brought into use until such approved details are implemented. 6. Unless otherwise agreed in writing with the Local Planning Authority there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to the completion of the approved foul drainage works. 7. Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site during demolition and construction works. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. 8. The operator shall install and thereafter utilise as appropriate, wheel washing facilities on the site for the duration of the demolition and subsequent building works. Prior to its installation on site, full details of its specification and siting shall be first agreed with the Local Planning Authority. 9. Except in case of emergency or as agreed in writing with the Local Planning Authority, no operations on site, including demolition works, or HGV movements onto or off site shall take ... view the full minutes text for item 26.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk