CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council
Planning Board, Thursday 15 September 2005

Construction of flood alleviation scheme (application under Regulation 3 & 9A of the Town and Country Planning Regulations 1992) at land adjacent to the River Don from Bessemer Way to Main Street, Rotherham Town Centre, Rotherham for Rotherham Metropolitan Borough Council (RB2005/0026(FUL))

Approved Planning 1 paper

Planning Board approved this item on Thursday 15 September 2005. Below is the council's own wording, with the papers it was decided on.

Item69

Resolved

Resolved :- That planning permission be granted, subject to the following conditions:- Visual amenity 1. No development shall take place until samples of the materials to be used in the construction of the external surfaces of the development, hereby permitted, have been submitted to, and approved in writing by, the Local Planning Authority and the development shall be carried out in accordance with the approved details. 2. No development shall take place until sections through the embankment within the Centenary Riverside site have been submitted to, and approved in writing by, the Local Planning Authority and the development shall be carried out in accordance with the approved details. 3. No development shall take place until details of the design, height and facing materials to be used in the construction of the cantilever retaining wall (at location Don12-6550), hereby permitted, have been submitted to, and approved by, Local Planning Authority and the development shall be carried out in accordance with the approved details. Drainage 4. Unless otherwise agreed in writing by the Local Planning Authority, no building or other obstruction shall be located over or within 6.0 (six) metres either side of the centre line of the sewers, which cross the site (Protected strip widths of 12 metres). 5. Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage , the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must ... view the full minutes text for item 69.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Planning Board
This report is being read into text

Papers are read newest first, so recent reports come through within hours. Until then, open it at source.

Open the PDF

Papers for this item

Kept in our archive, download once signed in
PDF
Construction of flood alleviation scheme (application under Regulation 3 & 9A of the Town and Country Planning Regulations 1992) at land adjacent to the River Don from Bessemer Way to Main Street, Rotherham Town Centre, Rotherham for Rotherham Metropolitan Borough Council (RB2005/0026(FUL)) PDF 170Report Download

At this meeting

Whole meeting

Who was there

12 of 21 attended
SW
Councillor Sheila WalkerChair, present
AA
Councillor Alan AtkinMember, expected
PB
Councillor Patrick BurkeMember, apologies
JB
Councillor Josephine BurtonMember, apologies
BC
Councillor Brian CuttsMember, expected
BD
Councillor Barry DodsonMember, present
DH
Councillor David HallMember, present
BK
Councillor Barry KayeMember, apologies
NL
Councillor Neil LicenseMember, present
RL
Councillor Reg LittleboyMember, apologies
RM
Councillor Rose McNeelyMember, present
GN
Councillor Geb NightingaleMember, present

All 21 on the meeting page

More from Rotherham Planning Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Minutes of the previous meeting held on 8th October 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 8 th October, 2026, be ... Approved Open
29 Oct 2026 Development Proposals- (1 ) That , on the development proposals now considered, the requisite notices be issued and be made available on t... Approved Open
29 Oct 2026 Report of the Service Director for Planning, Regeneration and Transport - Whitestone Solar Farm - Nationally Significant Infrastructure Project Update- That the update be received and the contents noted. Noted Open
8 Oct 2026 Minutes of the previous meeting held on 17th September, 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 17 th September, 2026, ... Approved Open
8 Oct 2026 Development Proposals- (1) That, on the development proposals now considered, the requisite notices be issued and be made available on the... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies