Item150
Resolved
Resolved :- (1) That the application be referred to the Government Office for Yorkshire and the Humber (GOYH) for consideration as a departure from the Rotherham Unitary Development Plan under the Town and Country Planning (Development Plans and Consultation) (Departures) Directions 1999. (2) That consequent upon GOYH deciding not to intervene on this application, planning permission be granted for the reasons listed in the report and subject to the following conditions:- 1. Prior to the commencement of the development hereby approved a specification and programme of works shall be provided to the Local Planning Authority for approval in writing. This shall include the following details:- · 1:200 scale drawing showing trees to be retained and those to be lost, protective fencing to be erected during construction works. All shrubs to be retained should be detailed. · Details of the proposed surfacing which should be a grass create type construction. · Details of any boundary treatments. · Details of position of exact car parking spaces. · Details of how the site will be reinstated after the expiry of the permission. · The approved document shall be implemented prior to the first use of the site. 2. The permission hereby approved is valid for three years only, after which the site shall be reinstated in accordance with approved details to be provided to the Local Plannning Authority as detailed in condition 1 above. 3. Details of the proposed means of disposal of foul and surface water drainage, including details of any off-site work, shall be submitted to and approved by the Local Planning Authority and the development shall not be brought into use until such approved details are implemented. 4. Before the development is brought into use, that part of the site to be used by vehicles shall be properly drained and constructed in concrete, tarmacadam , block paving or other such material as may be agreed by the Local Planning Authority and shall thereafter be maintained in a sound condition. 5. The area shaded dark green on the submitted plan shall remain clear of all obstructions to visibility in excess of 900mm in height measured above the nearside road channel. 6. The areas shaded red on the submitted plan shall remain clear of all obstructions to visibility in excess of 600mm in height measured above the footway. Reasons:- 1. In the interest of the visual amenity of the site and in accordance with policies ENV3.1 Development and the Environment. 2. The car parking is required for a temporary period only and the site should be reinstated after this period. 3. To ensure that the development can be properly drained in accordance with UDP policies ENV3.2 ‘Minimising the Impact of Development’ and ENV3.7 ‘Control of Pollution’. 4. To encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit ... view the full minutes text for item 150.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk