Item33
Resolved
Resolved :- That planning permission be granted for the reasons adopted by Members at the meeting and appended to the minutes and subject to the following conditions:- 1. The permission, hereby granted, shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below) and written statement dated February, 2008 except as shall be otherwise agreed in writing by the Local Planning Authority (Drawing CS/0522/2 received on 8th February, 2008). 2. Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0800 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Local Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided. 3. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through an oil interceptor designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. 4. Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage , the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. 5. All metal recycling materials shall be stored within the proposed bays in the processing area on site as shown in the approved plan. 6. Details of the proposed concrete ... view the full minutes text for item 33.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk