Item65
Resolved
- That planning permission be granted for the reasons adopted by Members at the meeting and subject to the following conditions:- 1. The permission, hereby granted, shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below) except as shall be otherwise agreed in writing by the Local Planning Authority (Drawing numbers 28/80 1-9) (received 28th May, 2008) 2. No development shall take place until samples of the materials to be used in the construction of the external surfaces of the development, hereby permitted, have been submitted to, and approved in writing by, the Local Planning Authority and the development shall be carried out in accordance with the approved details. 3. Prior to commencement of development, a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:- · The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. · The extent of any changes to existing ground levels, where these are proposed. · Any constraints in the form of existing or proposed site services, or visibility requirements. · Areas of structural and ornamental planting that are to be carried out. · The positions, design, materials and type of any boundary treatment to be erected. · A planting plan and schedule detailing the proposed species, siting , quality and size specification, and planting distances. · A written specification for ground preparation and soft landscape works. · The programme for implementation. · Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. The scheme shall thereafter be implemented in accordance with the approved landscape scheme and in accordance with the appropriate standards and codes of practice within a timescale agreed, in writing, by the Local Planning Authority. 4. Any plants or trees which within a period of five years from completion of planting die, are removed or damaged, or that fail to thrive shall be replaced within the next planting season. Assessment of requirements for replacement planting shall be carried out on an annual basis in September of each year and any defective work or materials discovered shall be rectified before 31st December of that year. 5. The site shall be developed with separate systems of drainage for foul and surface water on and off site. 6. No development shall take place until details of the proposed means of disposal of foul and surface water drainage, including details of any balancing works and off site works, have ... view the full minutes text for item 65.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk