Item7
Resolved
- (1) That the Council enter into a supplemental agreement with the developer under Section 106 of the Town and Country Planning Act 1990 to link this development with the original permission granted on the site overall (RB2007/1383). (2) That, upon the satisfactory conclusion of such an agreement, the Council grant permission for the reasons adopted by Members at the meeting and subject to the following conditions:- 1. Surface water from areas likely to receive petrol/oil contamination (e.g. vehicle parking areas) shall be passed through effective oil/grit interceptors prior to discharge to any sewer or watercourse. 2. Details of the proposed means of disposal of foul and surface water drainage, including details of any off-site work, shall be submitted to, and approved by, the Local Planning Authority and the development shall not be brought into use until such approved details are implemented. 3. Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either:- (a) a permeable surface and associated water retention/collection drainage, or; (b) an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. 4. Effective steps shall be taken by the developer to prevent the deposition of mud and other material on the adjoining public highway caused by vehicles entering and leaving the site during the construction of the development. 5. Before the development is brought into use the car parking area shown on the approved plan shall be provided, marked out and thereafter maintained for car parking. 6. Prior to commencement of development, a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:- - The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. - The extent of any changes to existing ground levels, where these are proposed. - Any constraints in the form of existing or proposed site services, or visibility requirements. - Areas of structural and ornamental planting that are to be carried out. - The positions, design, materials and type of any boundary treatment to be erected. - A planting plan and schedule detailing the proposed species, siting , quality and size specification, and planting distances. - A written specification for ground preparation and soft landscape works. - The programme for implementation. - Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. The scheme shall thereafter be ... view the full minutes text for item 7.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk