CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council
Planning Board, Thursday 13 August 2009

Visit of Inspection - Demolition of existing link corridor and erection of single storey building to form psychiatric intensive care unit and section 136 suite (a place of safety where a person can be detained for up to 72 hours) at Swallow

Approved Planning 1 paper

Planning Board approved this item on Thursday 13 August 2009. Below is the council's own wording, with the papers it was decided on.

Item46

Resolved

Resolved :- That planning permission be granted for the reasons adopted by Members at the meeting and appended to the minutes and subject to the following conditions:- 1. Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either:- (a) a permeable surface and associated water retention/collection drainage, or; (b) an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. 2. Before the development is brought into use the car parking area shown on the approved plan shall be provided, marked out and thereafter maintained for car parking. 3. Prior to commencement of development, a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:- - The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. - The extent of any changes to existing ground levels, where these are proposed. - Any constraints in the form of existing or proposed site services, or visibility requirements. - Areas of structural and ornamental planting that are to be carried out. - The positions, design, materials and type of any boundary treatment to be erected. - A planting plan and schedule detailing the proposed species, siting , quality and size specification, and planting distances. - A written specification for ground preparation and soft landscape works. - The programme for implementation. - Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. The scheme shall thereafter be implemented in accordance with the approved landscape scheme within a timescale agreed, in writing, by the Local Planning Authority. 4. Any plants or trees which within a period of 5 years from completion of planting die, are removed or damaged, or that fail to thrive shall be replaced within the next planting season. Assessment of requirements for replacement planting shall be carried out on an annual basis in September of each year and any defective work or materials discovered shall be rectified before 31st December of that year. 5. No work or storage on the site shall commence until all the trees/shrubs to be retained have been protected by the erection of a strong durable 2.30 metre high barrier fence in accordance with BS 5837: 2005 Guide for Trees in Relation to Construction. This fence and other recommended protection shall be implemented in ... view the full minutes text for item 46.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Planning Board
This report is being read into text

Papers are read newest first, so recent reports come through within hours. Until then, open it at source.

Open the PDF

Papers for this item

Kept in our archive, download once signed in
PDF
Visit of Inspection: Demolition of existing link corridor and erection of single storey building to form psychiatric intensive care unit and section 136 suite (a place of safety where a person can be detained for up to 72 hours) at Swallownest Court, Aughton Road, Aughton for RDASH Mental Health NHReport Copy on its way

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. Visit of Inspection - Demolition of existing link corridor and erection of single storey building to form psychiatric intensive care unit and section 136 suite (a place of safety where a person can be detained for up to 72 hours) at SwallowThis decision
  2. Visits of InspectionApproved
  3. Visit of Inspection - Erection of building for use as tea rooms (Use Class A3) including formation of gardens and car parking at land at Wellgate, Rotherham Town Centre (RB2019/0773)Approved
  4. Visit of Inspection - Erection of 108 No. dwellinghouses on land off Nethermoor Drive, Wickersley (RB2017/0215)Agreed
  5. Visit of Inspection - Erection of 28 No. dwellinghouses, details of access and landscaping at land east of Penny Piece Lane, North Anston for Duchy Homes & Yorkshire Merchant Securities Ltd. (RB2017/183)Agreed
  6. Introduction of a charging scheme for Food Hygiene Rating re-inspection visitsDecided

More from Rotherham Planning Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Minutes of the previous meeting held on 8th October 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 8 th October, 2026, be ... Approved Open
29 Oct 2026 Development Proposals- (1 ) That , on the development proposals now considered, the requisite notices be issued and be made available on t... Approved Open
29 Oct 2026 Report of the Service Director for Planning, Regeneration and Transport - Whitestone Solar Farm - Nationally Significant Infrastructure Project Update- That the update be received and the contents noted. Noted Open
8 Oct 2026 Minutes of the previous meeting held on 17th September, 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 17 th September, 2026, ... Approved Open
8 Oct 2026 Development Proposals- (1) That, on the development proposals now considered, the requisite notices be issued and be made available on the... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies