Rotherham Metropolitan Borough Council
Planning Board, Thursday 14 October 2010

Construction and operation of a Biomass Energy Development incorporating two associated biomass combined heat and power (CHP) plants, two chimney stacks (30m and 40m) in height with a 200,000 tonne per annum wood pellet manufacturing proces

Agreed Planning 1 paper

Planning Board agreed this item on Thursday 14 October 2010. Below is the council's own wording, with the papers it was decided on.

Item84

Resolved

- (1) That the Council enter into an agreement with the developer under Section 106 of the Town and Country Planning Act 1990 for the purposes of ensuring:- · A contribution of £45,000 to be used for the construction of the Fixed Link Road at Junction 34 of the M1. · A contribution of £2,306 towards the A1 Bus Service. · A contribution of £10,000 (annual payment of £2,000 for each of the first 5 years following construction of the plant) towards increased habitat management at Centenary Riverside. · A contribution of £6,000 (annual payment of £1,200 for each of the first 5 years following construction of the plant) towards the provision of annual baseline Phase 1 habitat surveys of the Centenary Riverside. · A contribution of £10,000 towards additional planting on the Centenary Riverside boundary. (2) That, upon the satisfactory completion of the legal agreement, the Council grant permission for the reasons adopted by Members at the meeting and subject to the following conditions:- Time Limit 1. The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Approved Plans 2. The development shall only take place in accordance with the submitted details and specifications shown on the plans listed below:- · Location plan – Drg No Brite – 1014b · Existing Layout – Drg No Brite 1012b · Site Layout – Drg No Brite 1010g · 3D layout – Drg No Brite 1009b · Elevations of Solid Biomass Plant Drg No Brite 1011b – sheet 1 · Elevations of Liquid Biomass & Pelleting Plant - Drg No Brite 1011b – sheet 2 · Elevations of Timber Store – Drg No Brite 1011a – sheet 3 · Preliminary Site Section – drg No Brite 1013a · Sketch Planting Scheme – Drg No 403-103 A · Plant Layout 1 – Drg No Brite 1019 – September 2010 · Plant Layout 2 – Drg No Brite 1020 – September 2010 Finished Materials 3. No development shall take place until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to, and approved in writing by, the Local Planning Authority and the development shall be carried out in accordance with the approved details. Environmental 4. Prior to the commencement of development details of the measures to be employed to prevent the egress of mud, water and other detritus onto the highway and details of the measures to be employed to remove any such substance from the highway shall be submitted to, and approved in writing by, the Local Planning Authority. Such measures shall be used for the duration of the works. 5. At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers , sprayers whether mobile or fixed, or similar equipment. At such times when due to ... view the full minutes text for item 84.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Planning Board, 76 pages

Recommendation

A. That the Council resolves to enter into a legal agreement with the applicant under the provisions of Section 106 of the Town and Country Planning Act 1990 for the purposes of ensuring:

1. A contribution of £45,000 to be used for the construction of the Fixed Link Road at Junction 34 of the M1.

2. A contribution of £2,306 towards the A1 Bus Service.

3. A contribution of £10,000 (annual payment of £2,000 for each of the first 5 years following construction of the plant) towards increased habitat management at Centenary Riverside.

4. A contribution of £6,000 (annual payment of £1,200 for each of the first 5 years following construction of the plant) towards the provision of annual baseline Phase 1 habitat surveys of the Centenary Riverside.

5. A contribution of £10,000 towards additional planting on the Centenary Riverside boundary.

STATEMENT OF REASONS FOR DECISION TO GRANT PLANNING PERMISSION

1. Having regard to the Development Plan and all other relevant material considerations as set out below:

a) Development Plan

Local Planning Policy EC1.1 ‘Safeguarding Existing Industrial and Business Areas’ states the Council will support proposals which safeguard the viability of established industrial and business areas, including those which seek to improve buildings, infrastructure and the environment.

EC3.1 ‘Land identified for Industrial and Business Uses’ states development falling within classes B1, B2 and B8 will be acceptable in such areas, subject to no adverse effect on the character of the area or on residential amenity, adequate arrangements for the parking and manoeuvring of vehicles associated with the proposed development and compatibility with adjacent existing and proposed land uses.

ENV3.1 ‘Development and the Environment’ seeks to ensure all development makes a positive contribution to the environment by achieving an appropriate standard of design having regard to architectural style, scale, materials, relationship to locality, siting, screening and boundary treatment.

ENV3.2 ‘Minimising Impact of Development’ states in considering the scale, appearance, nature and location of development and infrastructure proposals, the Council will seek to minimise adverse impact on the environment, and to conserve and improve its quality.

UTL3.4 ‘Renewable Energy’ favours proposals for the generation of power from renewable energy sources unless the proposed development would cause demonstrable harm to interests of acknowledged importance.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Construction and operation of a Biomass Energy Development incorporating two associated biomass combined heat and power (CHP) plants, two chimney stacks (30m and 40m) in height with a 200,000 tonne per annum wood pellet manufacturing process and associated infrastructure and landscaping works at FirReport 76 pages DownloadRead as text

At this meeting

Whole meeting

More from Rotherham Planning Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Minutes of the previous meeting held on 8th October 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 8 th October, 2026, be ... Approved Open
29 Oct 2026 Development Proposals- (1 ) That , on the development proposals now considered, the requisite notices be issued and be made available on t... Approved Open
29 Oct 2026 Report of the Service Director for Planning, Regeneration and Transport - Whitestone Solar Farm - Nationally Significant Infrastructure Project Update- That the update be received and the contents noted. Noted Open
8 Oct 2026 Minutes of the previous meeting held on 17th September, 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 17 th September, 2026, ... Approved Open
8 Oct 2026 Development Proposals- (1) That, on the development proposals now considered, the requisite notices be issued and be made available on the... Approved Open