Resolved
Resolved :- That the revisions to planning conditions/reasons Nos. 8 and 27 as set out below be approved:- Condition 8. “No development hereby permitted shall take place until details of a scheme to provide demountable flood defences/or other such measures as agreed by the Local Planning Authority, to protect the Listed Guest and Chrimes building when the site is subject to a flood warning, have been submitted to and approved by the Local Planning Authority, unless otherwise agreed in writing with the Local Planning Authority. The scheme shall include full details of the location, design, materials, height, operational details, tie in with existing flood defences and a timetable for their implementation. The scheme shall be implemented in accordance with the approved details/timetable, unless otherwise agreed in writing with the Local Planning Authority.” Condition 27 “The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) by Opus Joynes Pike (Ref: J-D0517-R001, dated July 2010); the Addendum to the Flood Risk Assessment by 3E Consulting Engineers (Issue 2, dated April 2011); the following mitigation measures detailed within the FRA and Addendum, and in accordance with the below timescales:- 1. Identification and provision of safe route(s) into and out of the site to an appropriate safe haven; page 10 of the FRA and page 3 of the Addendum state that a permanent access and egress route shall be provided from the site to Main Street to the north, at a minimum site level of 28.21 metres above Ordnance Datum (AOD). 2. Site levels for the stadium shall be set no lower than 28.21 m AOD, as stated on page 22 of the FRA and page 3 of the Addendum (which corresponds to the 1 in 100 year modelled water level for the River Don's ‘Don Bridge Removed' scenario, plus 550 mm freeboard, 600 mm allowance for climate change and 300 mm wear and tear/settlement provision). 3. Site levels for the car park to be set no lower than 26.8 mAOD (as stated on page 3 of the Addendum). 4. Provision of a continuous flood defence line through the site, from Main Street at the north of the site to the southern boundary of the site, set at alevel of 28.21 mAOD (as stated on page 3 of the Addendum and shown on drawing ‘9060/CSK06 Rev. P7 – Planning Drawing Enabling Works’ by 3E Consulting Engineers (dated 13/04/11). 5. A permanent strip of land adjacent to the River Don to be kept clear of all new buildings and structures (including decking, gates, walls, fences and trees), with the easement width as shown ... view the full minutes text for item 197.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk