Resolved
Resolved :- That planning permission be granted for the reasons adopted by Members at the meeting and subject to the following conditions:- 1. The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. 2. The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below) except as shall be otherwise agreed in writing by the Local Planning Authority Plan Nos. 904-17B/18B/19B/20B/ 21/22/23B/24B/25B and 26B. 3. No tree shall be cut down, uprooted or destroyed nor shall any tree be pruned other than in accordance with the approved plans and particulars, without the written approval of the Local Planning Authority. Any pruning works approved shall be carried out in accordance with British Standard 3998 (Tree Work). If any tree is removed, uprooted or destroyed or dies, another tree shall be planted in the immediate area and that tree shall be of such size and species, and shall be planted at such time, as may be specified in writing by the Local Planning Authority. 4. The detailed plans to be submitted in accordance with this permission shall include a detailed landscape scheme. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:- · The retention and/or replacement of existing trees, shrubs and hedgerows along the northern site boundary with the existing properties at nos. 15 – 17 Rodwell Close. · The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. · The extent of any changes to existing ground levels, where these are proposed. · Any constraints in the form of existing or proposed site services, or visibility requirements. · Areas of structural and ornamental planting that are to be carried out. · The positions, design, materials and type of any boundary treatment to be erected. · A planting plan and schedule detailing the proposed species, siting , quality and size specification, and planting distances. · A written specification for ground preparation and soft landscape works. · The programme for implementation. · Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. The scheme shall thereafter be implemented in accordance with the approved landscape scheme within a timescale agreed, in writing, by the Local Planning Authority. 5. Any plants or trees which within ... view the full minutes text for item 4.