CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council
Regeneration and Environment (to, Tuesday 21 June 2011

Flash Lane, Bramley - proposed traffic calming scheme

Decided Committee 1 paper

Regeneration and Environment (to decided this item on Tuesday 21 June 2011. Below is the council's own wording, with the papers it was decided on.

Item87

Resolved

Resolved :- (1) That the objections to the proposed traffic calming scheme be acceded to and the traffic calming scheme be not implemented. (2) That an informal pedestrian crossing be implemented between Prospect Close and Wadsworth Road to include lowered kerbs and a short section of footway to link into the existing footway as detailed in the submitted report and illustrated on Drawing No. 126.17/TT142 (Appendix B). (3) That the objectors be informed of the above decisions.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Regeneration and Environment (to, 7 pages

Recommendations

Cabinet Member is asked to resolve that:

(i) The objections to the proposed traffic calming scheme are acceded to and the traffic calming scheme is not implemented;

(ii) An informal pedestrian crossing is implemented between Prospect Close and Wadsworth Road to include lowered kerbs and a short section of footway to link into the existing footway;

(iii) The objectors be informed of the outcome;

Page 1 7. Proposals and Details In 2005 Ben Bailey Homes Limited received planning approval for the construction of a new housing development on Progress Drive off Flash Lane, Bramley. As part of this planning approval Ben Bailey Homes Limited entered into a section 106 agreement, which required them to contribute £10,000 towards the cost of a pedestrian crossing on Flash Lane between Prospect Close and Wadsworth Road near to the play area and community facilities. When considering the information submitted in support of the planning application Transportation Officers considered that a zebra crossing may be desirable and an estimate was made of the costs of introducing such a feature, though as always the detailed assessment and design had yet to be carried out and as such no specific reference is made within the Section 106 agreement to providing a zebra crossing. The £10,000 was consequently submitted by the developer and lodged with the Council in October 2006.

Investigations into the feasibility of providing a controlled pedestrian crossing (zebra, pelican etc) commenced in autumn 2007 based on information provided from a summary made of the Traffic Impact Assessment. This investigation entailed undertaking a speed survey, measuring carriageway widths and an assessment of the number of vehicles travelling along Flash Lane as well as pedestrians crossing Flash Lane between Prospect Close and Wadsworth Road. From the number of vehicles recorded, it was shown that there would need to be on average, 225 pedestrians crossing each hour over a 4 hour period in order for a controlled crossing to be considered in accordance with the Councils criteria for implementing a controlled pedestrian crossing. Observations on site clearly demonstrated that even during the peak hours when school children were heading to and from the nearby Wickersley Comprehensive School, the number of pedestrians crossing Flash Lane between Prospect Close and Wadsworth Road did not meet 225 and as such a controlled crossing could not be promoted. However, in view of the developer contribution that Rotherham MBC had received, it was thought that an alternative scheme should be considered which would assist pedestrians to cross Flash Lane not only between Prospect Close and Wadsworth Road but along its full length by reducing vehicle speeds which the surveys had demonstrated were above the existing 30mph speed limit.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Flash Lane, Bramley: proposed traffic calming schemeAppendix 7 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. Flash Lane, Bramley - proposed traffic calming schemeThis decision
  2. Erection of 99 No. two and three storey dwelllinghouses/apartments and formation of a temporary vehicular access (via Flash Lane) at land at Brookhaven Way, Balmer Rise and Flash Lane, Bramley, Rotherham (RB2002/1657)Agreed
  3. Land at Flash Lane, BramleyNoted
  4. Planning Agreement in respect of the erection of 104 dwellings at Brookhaven Way, Balmer Rise and Flash Lane, Bramley for Jones Homes (Northern) Limited (RB2002/1657)Agreed

More from Rotherham Regeneration and Environment (to

All decisions
MeetingDecisionOutcome
21 Jun 2011 Duke of Norfolk estate - Proposed No Waiting At Any Time RestrictionsResolved :- (1) That the proposal as currently advertised be implemented and then monitored for 2 months. (2) That th... Decided Open
21 Jun 2011 Minutes of a meeting of the Local Development Framework Members' Steering Group held on 15th April, 2011Resolved :- That the content of the minutes be noted. Noted Open
21 Jun 2011 Opening of offers and e-tenders- That the action of the Cabinet Member on 31 st May, 2011 in opening offers and e-tenders for the following be recor... Decided Open
21 Jun 2011 Minutes of a meeting of the Transport Liaison Group held on 16th March, 2011Resolved :- That the contents of the minutes be noted. Noted Open
21 Jun 2011 Petition requesting re-surfacing of carriageway on Chapel Walk, RawmarshResolved :- That the lead petitioner be informed that resurfacing of Chapel Walk, Rawmarsh , will be assessed for pri... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies