Proposed Full Signalisation of A631/M18 Junction 1
ApprovedCommittee3 papers
Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012) approved this item on Monday 19 September 2011. Below is the council's own wording, with the papers it was decided on.
Resolved :- (1) That the proposal by the Highways Agency to fully signalise the junction of the A631 and M18 at Hellaby be endorsed, subject to raising of the parapet on the north bridge, and satisfactory completion of safety audit procedures. (2) That approval be given for the removal of the footway, shown on the attached Drawing No. 126/17/TT165, under the power conferred by section 66 (4) of the Highways Act 1980 and for its replacement by a shared use pedestrian and cycle path under the power conferred by section 65 (1) of the same Act. (3) That approval be given for the inclusion of the detailed design of the shared pedestrian and cycle path in the design for the signalisation of the junction of the M18 and A631 and for it to be implemented as part of those works. (4) That a further report be submitted to the Cabinet Member should any problems arise with the scheme.
Word for word from the decision Rotherham published for this meeting.Source: moderngov.rotherham.gov.uk
Report to Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012), 3 pages
Recommendations
Cabinet Member is asked to
1. Endorse the proposal by the Highways Agency to fully signalise the junction of the A631 and M18 at Hellaby, subject to raising of the parapet on the north bridge, and satisfactory completion of safety audit procedures.
2. Approve the removal of the footway shown on the attached drawing number 126/17/TT165 under the power conferred by section 66 (4) of the Highways Act 1980 and for its replacement by a shared use pedestrian and cycle path under the power conferred by section 65 (1) of the same Act
3. Approve the inclusion of the detailed design of the shared pedestrian and cycle path in the design for the signalisation of the junction of the M18 and A631 and for it to be implemented as part of those works. 7. Proposals and Details The junction of the M18 and the A631 at Hellaby is key to traffic movement along the A631 corridor as well as traffic leaving and joining the M18. Currently, traffic leaving the M18 is subject to delay at certain times of the day as a result of the volume of traffic on the A631. Similarly, traffic on the A631 experiences delay at peak times as a result of the difficulty entering the circulatory carriageway of the roundabout. The proposal by the Highways Agency (HA) to signalise the junction will address both of these issues.
The proposal is shown on attached drawing number 530017, attached as Appendix A to this report, and consists of the signalisation of the remaining arms of the junction to complement the already signalised north bound exit slip road. In addition, Toucan crossings are to be provided at the top of the southbound entry and exit slip roads and northbound entry slip road, with the whole junction being MOVA controlled. High friction surfacing is to be provided on all of the approaches to stop lines. Traffic modelling indicates that a signalised junction will perform better than the existing priority control and has been tested using traffic flows that are anticipated 10 years after opening.
In order to complement the existing shared use cycle/footway on the south bridge of the roundabout, which was introduced at the same time as the northbound exit slip road was signalised, it is proposed to convert the footway on the north bridge to shared use status along with the associated footway approaches on the north side of the A631 to the junction. This will enable pedestrians and cyclists to make full use of the proposed Toucan crossings and increase local accessibility. It is therefore proposed to change the legal status of the footway on the north bridge, and the associated footway approaches on the north side of the A631 to the junction, to shared use, which legally permits cyclists and pedestrians to use the footway. This will allow cyclists to ride on the footway and use the Toucan crossing facilities provided. The proposed layout is indicated on drawing number 126/17/TT165 attached as Appendix B to this report. This is dependent on the Highways Agency confirming that the parapet on the north bridge will be raised.
The signalisation scheme will supplement the recently introduced local safety scheme on the roundabout and its approaches (minute number 220 of 17th March 2008 refers). This consisted of improvements to road signs, markings and street lighting and was designed with a view to traffic signals being introduced at a later date.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012) at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Previous Meetings- That the minutes of the previous meetings of the Cabinet Member for Town Centres, Economic Growth and Prosperity be...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.