Item41
Resolved
Resolved :- (1) That, on the development proposals now considered, the requisite notices be issued and be made available on the Council’s website and that the time limits specified in Sections 91 and 92 of the Town and Country Planning Act 1990 apply. In accordance with the right to speak procedure, the following people attended the meeting and spoke about this application:- - Erection of toilet block to side and canopy to front at 131 Bawtry Road , Wickersley for [name removed] (RB2018/1299) [name removed] (Applicant) Parish Councillor P. Thirlwall (Objector speaking on behalf of Wickersley Parish Council) (2) That applications RB2018/1032 and RB2018/1093 be granted for the reasons adopted by Members at the meeting and subject to the relevant conditions listed in the submitted report. (3) That application RB2018/1134 be granted for the reasons adopted by Members at the meeting and subject to the relevant conditions listed in the submitted report and with the inclusion of the following additional condition:- 07 There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change. Reason To ensure that no surface water discharges take place until proper provision has been made for its disposal and in the interest of sustainable drainage. (4) That application RB2018/1299 be granted for the reasons adopted by Members at the meeting and subject to the relevant conditions listed in the submitted report and with an amendment to condition number 03 (as shown below) and with the inclusion of the following additional condition number 04 and an amendment to condition 05 (previously 04) as detailed below:- 03 No above ground development shall take place until details of the materials to be used in the construction of the proposed single storey side extension and all external surfaces of the canopy (including the retractable sides) hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Core Strategy Policy CS28 ‘Sustainable Design.’ 04 No above ground development shall take place until full details of the means of operation of the proposed roof ... view the full minutes text for item 41.
Word for word from the decision Rotherham published for this meeting.
Source: moderngov.rotherham.gov.uk