- (1) That, on the development proposals now considered, the requisite notices be issued and be made available on the Council’s website and that the time limits specified in Sections 91 and 92 of the Town and Country Planning Act 1990 apply. In accordance with the right to speak procedure the following people attended the meeting and spoke about the applications below:- - Erection of a battery energy storage facility including storage containers and other support infrastructure and equipment at land north of Brinsworth Road, Brinsworth for Root-Power South (RB2024/1307) [name removed] (on behalf of the Applicant) [name removed] (Objector) [name removed] (Objector) Statements were read out on behalf of [name removed] and Councillor A. Carter (Objectors) - Demolition of bungalow and detached outbuilding and erection for four dwellinghouses at 140 Moor Lane South, Ravenfield for [name removed] (RB2024/1470) [name removed] (Applicant) [name removed] (Objector) (2) That applications RB2024/1307 and RB2024/1470 be granted for the reasons adopted by Members at the meeting and subject to the relevant conditions listed in the submitted report. (Councillor Fisher declared a personal interest in application RB2024/1307 (erection of a battery energy storage facility including storage containers and other support infrastructure and equipment on land north of Brinsworth Road, Brinsworth ) on the grounds of being a shareholder of a company who made battery storage cells)
Word for word from the decision Rotherham published for this meeting.Source: moderngov.rotherham.gov.uk
RH1970/6426 - Outline for erection of light industrial buildings - REFUSED EIA screening opinion
The proposed development falls within the description contained at Paragraph 10 (b) of Schedule 2 of the Town and Country Planning (Environment Impact Assessment) (England and Wales) Regulations 2017. However as the scheme does not exceed 50MHW a Environmental Impact Assessment screening opinion is not required.
3. Proposal
The proposed development involves the construction of a Battery Energy Storage System (BESS) with a capacity of up to 40 MW on a site covering 0.76 hectares.
The proposal shall be for a limited period of forty years from energisation, after which it shall be discontinued and all built form, including all hard surfacing and access tracks, removed from the site in accordance with a restoration scheme to be submitted and approved by the LPA.
The key components of the development include:
• 5no. battery clusters in containers on concrete foundation • 5no. BESS transformers and inverters on bunded concrete foundation • 1no. site office/welfare and LV switchroom placed on paving slabs at the corners • 1no. 33kV BESS switchroom • DNO substation on concrete foundation • 1no. 33kV/415V site supply transformer on bunded foundation • 2no. car parking spaces • 2no. water tanks • 1no. fire hydrant
The compound is approx. 0.3ha and is accessed by an internal access track with two gated vehicular access points from the access road to the site with a third vehicular emergency exit on the northern boundary, along with a pedestrian access. The remainder of the site contains a SuDs pond and landscaping.
The compound will be surrounded by a 3m high fence. An acoustic barrier, to reduce noise impacts, will be sited along the southern boundary of the compound. It will be 3m in height and of a minimum mass of 12kg/m2.
The Applicant’s Flood Risk Assessment states that:
In accordance with national planning policy and guidance, all potential sources of flooding to the site have been considered. The Flood Risk Screening Assessment confirms that the site is overall at ‘low risk’ or lower from flooding from all sources and thus no bespoke flood mitigation measures are required. This report assesses the potential increase in surface water runoff attributed to the proposed development and proposes a surface water management strategy to manage this. The strategy is in accordance with sustainable drainage principles and allows the site to remain free of flooding during design storm events, whilst ensuring no increase of flood risk to offsite receptors and ensures no deterioration of the water environment.
Taking all of the above into account it is considered there is no impediment to the development proposals being granted planning permission on the grounds of flood risk and drainage provision.
The Applicant’s Safety Management Plan states that:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.