Sevenoaks Joint Transportation Board agreed this item on Wednesday 13 June 2012. Below is the council's own wording, with the papers it was decided on.
That a) Officers continue to explore environmental, driveability and non motorised improvement options within the terms of the Section 106 Agreement, and report back to the next meeting of the Board; and b) Officers proceed with the installation of CCTV cameras and UTC MOVA equipment at the Bat and Ball Junction, to enable remote monitoring of traffic and temporary remote changing of traffic signal timings inresponse to traffic situations.
Word for word from the decision Sevenoaks published for this meeting.Source: cds.sevenoaks.gov.uk
Sevenoaks Joint Transportation Board – 13 June 2012
Report of the: Strategic Transport and Development Planner: Chad Nwanosike
Status: For Member Decision
Chairman: [name removed] of Service: Head of KCC Highways & Transportation – Tim Read
Recommendation: That in view of the above information, Members are recommended to approve the ‘Way Forward and Next Steps’ as set out below.
Introduction
1. This report has been prepared for the Sevenoaks Joint Transportation Board Members for their information.
2. A planning application was submitted initially in February 2008 by Tarmac Limited for extension of extraction area and continued operation of existing processing and associated manufacturing plant and buildings and other operational areas at Sevenoaks Quarry.
3. In September 2010 Sainsbury’s was granted planning consent for the extension of the Sevenoaks store from 7,537m2 to 11,594m2.
4. Both Sevenoaks Quarry and Sainsbury’s are located close to the Bat and Ball, a critical junction in the local road network. Kent County Council secured highway contributions from both developments under Section 106 Agreement details of which are contained in Table 1 (Appendix A).
5. In 2008 Jacobs produced a concept design and cost estimate for the Bat and Ball junction. It proposed: • Removal of central islands on Otford Road • Extension of the two approach lanes • Provision of a controlled crossing facility on Otford Road.
6. The purpose of these measures was to improve capacity and hence ease congestion and improve air quality in the area.
7. The Benefits of these measures needed to be assessed in order to justify implementation. A study was therefore commissioned in March 2012 and the simplified study brief was to: • Model the existing situation at the Bat and Ball junction • Model a scenario with the Jacobs concept design implemented • Compare the two to establish the benefits.
Traffic Impact
8. The March 2012 assessment showed that the overall performance of the junction remains generally unchanged by the implementation of the Jacobs design, indicating that the measures provided limited benefits.
9. On the Otford Road approach queue lengths were reduced and capacity is increased, but not by a significant amount.
(Past studies)
10. A review in March 2008 considered a localised widening of Seal Road to provide a dedicated right turn lane. The initial design indicated that a lane length of some 40m could be achievable. However, even with substandard lane widths, the extent of carriageway widening required would have compromised the Bat and ball building and pedestrian access. As a result, the idea was not taken forward.
11. In September 2009 a review of the junction was undertaken with a view to increase capacity at the St John’s Hill approach. This looked at widening the carriageway on approach to the stopline to give an additional lane of some 40m length. Although this idea appeared feasible, the highway boundary and close proximity of retaining structures associated with the adjacent car dealership would have made it undeliverable due to the potential cost.
(Traffic impact conclusion)
12. It is therefore fair to state that there are no viable measures that would produce significant capacity improvements at the Bat and Ball junction.
Way Forward and Next Steps
13. The transport development and highway maintenance teams in KCC are getting together with the air quality team in SDC to establish effective improvement measures at Bat and Ball that are within the terms of the Section 106 Agreement.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Petition - Crossing at Bessels GreenThat the concerns raised by the petition be evaluated by Officers and a report brought back to a future meeting of th...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.