Resolved
That the three schemes be withdrawn.
Sevenoaks Joint Transportation Board decided this item on Tuesday 10 March 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
That the three schemes be withdrawn.
SEVENOAKS JOINT TRANSPORTATION BOARD – 10 MARCH 2015.
BAT & BALL AREA LOCAL CYCLING INFRASTRUCTURE PROPOSALS.
Report of the: Strategic Development Transport Planner – Adrian Pigott.
Status: For information / approval.
Chairman: [name removed].
Head of Service: Head of Transportation – Tim Read.
Introduction.
Kent County Council (KCC) Highways, Transportation & Waste is holding funding secured via Section 106 of the Town and Country Planning Act 1990 to improve cycling facilities at the Bat & Ball Junction and nearby locations. The Section 106 Agreements are linked to Sevenoaks Quarry (Tarmac Ltd/Ibstock Brick Hudsons Ltd) and Sainsbury’s Supermarket.
Layout and signal improvements are set to be introduced at the Bat & Ball junction in the Summer of 2015, which incorporate standard cycling infrastructure improvements such as Cycling Advanced Stop Lines within the design. The proposals presented in this report are separate from the main Bat & Ball junction improvement and neither set of proposals are directly inter-related. However, to minimise disruption, any works proposed in this report would be coordinated and delivered simultaneously.
The Sevenoaks Cycling Strategy highlights a number of key routes and improvements within the Sevenoaks area which should – over time – facilitate increased levels of cycling in the District and improve the safety of existing cyclists. The Strategy was developed by Kent County Council (KCC) in partnership with Sevenoaks District Council (SDC) and provides an overarching framework for the development of cycling in Sevenoaks, approved by the Sevenoaks Joint Transportation Board (JTB) in March 2012.
The proposals presented here form small components of that overarching Strategy which is supported at both District and County level.
In Autumn 2014, KCC consulted on three separate schemes, including: (1) Bradbourne Vale Road (see figure 3); (2) Hospital Road (see figure 4); (3) Crampton’s Road (see figure 5); These are described in more detail below, whilst the scheme consultation letters and supporting (conceptual) designs form Appendices 1-3 towards the end of this report.
FIGURE 1) BRADBOURNE VALE RD / HOSPITAL RD – LOCATIONS:
FIGURE 2) CRAMPTON’S ROAD – LOCATION: Scheme 1) Bradbourne Vale Road.
Recommendation 6c (p.46) of the Sevenoaks Cycling Strategy proposes a route from Bat and Ball junction to St John’s Road/Dartford Road junction (along Bradbourne Vale Road and St. John’s Road).
St. John’s Road and St. John’s Hill (which is the alternative north-south link) are relatively steep but St. John’s Road has significantly lower traffic volumes. The strategy suggests the footway on the southern side of Bradbourne Vale Road should be signed as a shared route facility for cyclists travelling in an east-west direction, and that the path could be widened if space permits.
The proposal forms part of a series of links which would facilitate a north-south cycle route between Otford and Sevenoaks. This section would provide an alternative route to St John’s Hill for cyclists travelling from north to south (in an uphill direction).
A route with lower traffic volumes is often preferable on hilly terrain due to the speed differential between cyclists and vehicles increasing, cyclists may also wander a little as their speed is reduced. For cyclists travelling from south to north (downhill) St John’s Road may be less problematic. This route would also link to the proposed east-west route across Sevenoaks, as presented in the Strategy.
The existing path cannot simply be signed as a shared (pedestrian-cycle) facility as it is too narrow and would endanger the safety of existing pedestrian users.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Bat and Ball ImprovementsReport | 658 KB | DownloadRead as text |
Follow Sevenoaks Joint Transportation Board at Sevenoaks and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Mar 2026 | MinutesThat the minutes of the meeting held 14 October 2025 be approved and signed by the Chairman as a correct record. | Approved | Open |
| 17 Mar 2026 | Petition - Crossing at Bessels GreenThat the concerns raised by the petition be evaluated by Officers and a report brought back to a future meeting of th... | Decided | Open |
| 17 Mar 2026 | Petition - Commuter Parking, Cherry AvenueThat the concerns raised by the petition be evaluated by Officers and a report brought back to a future meeting of th... | Decided | Open |
| 17 Mar 2026 | Sevenoaks 20mph Zone - 1 Year UpdateThat the report be noted. | Noted | Open |
| 17 Mar 2026 | Active Travel UpdateThat the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.