Resolved
That the report be noted.
Sevenoaks Joint Transportation Board noted this item on Tuesday 10 March 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
That the report be noted.
To: Sevenoaks Joint Transportation Board
By: KCC Highways and Transportation
Date: 10 March 2015
Subject: Highway Works Programme 2014/15
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction in 2014/15
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2014/15
Footway and Carriageway Improvement Schemes – see Appendix A
Street Lighting – see Appendix B
Bridge Works- see Appendix C
Conclusion
1. This report is for Members information.
Contact Officers:
The following contact officers can be contacted on 03000 41 81 81
Carol Valentine Highway Manager (West) Julian Cook Sevenoaks District Manager Sue Kinsella Street Lighting Manager Wendy Bousted Carriageway Surface Treatment Alan Casson Resurfacing Manager Mary Gillett Major Projects Planning Manager Neil Tree Footway Improvement Team Leader Katie Lewis Drainage Manager Toby Butler Intelligent Transport Systems Manager Tony Ambrose Structures Manager Appendix A – Footway and Carriageway Improvement Schemes
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer [name removed] Name Parish Extent of Works Current Status
A20 Teardrop roundabout and Works programmed to A20 London Road Farningham its approach from M25 J3 start March 2015
From the Teardrop Works programmed to A20 London Road Farningham Roundabout downhill to start April 2015 Dartford Road Roundabout.
Footway Improvement - Contact Officer [name removed] Name Parish Extent and Description of Current Status Works From its junction with Garth Road to its junction with Beechmont Road - Replacement of existing Works substantially Brattlewood Sevenoaks asphalt surface and renewal of completed kerbs where required
From its junction with The Rise to its junction with Weald Road - Replacement of Works substantially Garth Road Sevenoaks existing asphalt surface and completed renewal of kerbs where required
From its junction with Pilgrims Works Commenced Childsbridge Lane Kemsing/Seal Way to the Railway Bridge 25/11/14
From its junction with Morants Programmed to start Sundridge Road Chevening Court Road to Morants Court nd 2 February for 3 Farm weeks. Whole Length – Replacement Copperfields & of existing asphalt surface and Completed Kemsing Copperfields Orchard renewal of kerbs where required From its junction with Cedar Road to its junction with Completed Cobden Road Sevenoaks Quakers Hall Lane – Slurry Surfacing Appendix B – Street Lighting
Structural testing of KCC owned street lights has identified the following as requiring replacement this financial year.
Street Lighting Column Replacement – Contact Officer Sue Kinsella
Column Road Name Location Status Ref IUAP054 Top of Polhill IUAP065 Adj bus storage POLHILL, Dunton Green IUAP066 o/s The Retreat Expect work on site March Sevenoaks IUAP067 opp Garage 2015 IUAP068 o/s Calcutta Club IUAP086 near Garden Centre WHITE HART WOOD IWBX003 o/s 6a Completed Sevenoaks Replace zebra crossing Belisha Beacons to MAIN ROAD ISEQ801 improve lighting at Jw Four Elms Road Edenbridge ISEQ802 crossing Work expected March 2015 Replace zebra crossing Belisha Beacons to IAAY801 improve lighting at AZALEA DRIVE Adj 31/33 IAAY802 crossing Work expected March 2015
ILBN111 o/s 24 Work expected March ILBN112 o/s 40 2015 ILBN114 o/s 41 ILBN119 opp 92A ILBN120 o/s 106 ILBN121 opp 110 LONDON ROAD ILBN122 opp 128 Dunton Green ILBN123 o/s School ILBN124 o/s School ILBN125 opp Barretts Rd ILBN126 o/s 151 ILBN127 o/s 163 ILBN131 opp Village Hall ILBN132 o/s 190
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Sevenoaks Highway Works Programme 2014/15Report | 51 KB | DownloadRead as text |
Follow Sevenoaks Joint Transportation Board at Sevenoaks and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Mar 2026 | MinutesThat the minutes of the meeting held 14 October 2025 be approved and signed by the Chairman as a correct record. | Approved | Open |
| 17 Mar 2026 | Petition - Crossing at Bessels GreenThat the concerns raised by the petition be evaluated by Officers and a report brought back to a future meeting of th... | Decided | Open |
| 17 Mar 2026 | Petition - Commuter Parking, Cherry AvenueThat the concerns raised by the petition be evaluated by Officers and a report brought back to a future meeting of th... | Decided | Open |
| 17 Mar 2026 | Sevenoaks 20mph Zone - 1 Year UpdateThat the report be noted. | Noted | Open |
| 17 Mar 2026 | Active Travel UpdateThat the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.