That permission be granted in accordance with the Officer’s recommendation, subject to: · Condition No. 5 being amended to ensure that the colour finish be BS18B29 ; and · Condition No. 17 being amended to ensure that no lorries shall leave the development site between 11.00 pm and 2.00 am hours.
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
24 June 2014 12 Public Development Management Report
Application Number: 14/00784/EIA Parish: Much Wenlock
Proposal: Construction of four poultry sheds and feed bins, ancillary works, amendments to existing vehicular access, erection of biomass building and associated landscaping
Site Address: Corfton Farm, Corfton, Craven Arms, Shropshire, SY7 9DD
Contact: Tim Rogers (01743) 258773 Corfton Farm, Corfton, Craven Arms, South Planning Committee – 24 June 2014 Shropshire, SY7 9DD
Recommendation:- Approve subject to the conditions set out in Appendix 1.
REPORT
1.0THE PROPOSAL
1.1The proposal is to build a four-shed poultry unit on land adjacent to the existing farmstead at Corfton Farm, near Craven Arms. The proposed poultry sheds would would accommodate approximately 185,000 birds (combined). The chickens would be grown in 36-day crop cycles per year with a around a 10 day clean out and turn around period per crop.
1.2The sheds would measure 109.73m by 24.38m and The heights of each shed would measure 2.6 metres at the eaves, and 6 metres to the ridge vents. In addition to the four poultry sheds there will be 5 feed bins located in a group between the buildings at the yard end. They will have a maximum height of 6.6 metres. It is also proposed that 4 x 199kWh biomass boilers be constructed in order to reduce the carbon footprint of the proposed development. The feed bins would rise up slightly higher between the buildings. The biomass boiler housing would be located to the south-east of the proposed poultry sheds.
1.3The biomass boilers would be housed in a building to the south east of the poultry sheds. The housing will be split into two sections: one section storing the biomass and biomass hoppers, and the other side housing biomass boilers and associated flues. The buildings would be located on two level platforms excavated into the hillside above the existing farm buildings. The northern 2 buildings would be approximately 3m above the level of the southern two. The levelling of the sites will result in three of the proposed sheds being set well below the existing ground level.
1.4The proposed poultry sheds are to be of standard construction, comprising portal frames with profile sheet cladding finished in a BS12B29 Juniper Green colour to facilitate integration with existing agricultural structures. The appearance of the sheds will represent an extension of the existing agricultural development and accordingly appropriate in the rural landscape. The proposed biomass boiler housing will also be finished in matching external facing materials to the poultry sheds and coloured a BS12B29 Juniper Green.
1.5Excavated earth from levelling the site would be used to construct an earth bund along the north western and south western boundaries, screening the site from identified viewpoints. A hedgerow crossing the site is to be removed, the impact of which will be offset by additional native species hedgerow planting along the earth bund, which will further aid integration of the site with the surrounding landscape. The existing hedgerow along the north eastern boundary is to be retained. As such, the site will be fully enclosed.
1.6Access to the site is currently gained through the farm yard which is served by a private drive adjoining the B4368 approximately 250 metres to the south east of the site. It is proposed that part of the existing access track be closed off, and a new access installed in order to improve visibility onto the highway. A passing point will
Contact: Tim Rogers (01743) 258773 Corfton Farm, Corfton, Craven Arms, South Planning Committee – 24 June 2014 Shropshire, SY7 9DD
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.