Resolved
That, as per ... view the full minutes text for item 38.
Southern Planning Committee decided this item on Tuesday 29 August 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That, as per ... view the full minutes text for item 38.
Committee and date
South Planning Committee
29 August 2017
Development Management Report
Responsible Officer: Tim Rogers email: [email protected] Tel: 01743 258773 Fax: 01743 252619
Summary of Application
Application Number: 17/01033/EIA Parish: Tasley
Proposal: Erection of four poultry buildings with feed bins, one gate house, one boiler house and circular water tank; and associated infrastructure and landscaping scheme
Site Address: Footbridge Farm Tasley Bridgnorth Shropshire WV16 5LZ
Applicant: [name removed]: Kelvin Hall email: [email protected]
Grid Ref: 369337 - 293339
© Crown Copyright. All rights reserved. Shropshire Council 100049049. 2016 For reference purposes only. No further copies may be made.
Contact: Tim Rogers (01743) 258773 Footbridge Farm, Tasley, Bridgnorth, Planning Committee – 29 August 2017 Shropshire, WV16 5LZ
REPORT
Recommendation: That delegated authority is granted to the Planning Services Manager to grant planning permission subject to conditions as set out in Appendix 1, and any amendments considered necessary.
1.0THE PROPOSAL 1.1 The planning application seeks permission for the erection of four poultry rearing buildings and associated buildings and infrastructure including feed and wood pellet bins, a gate house, a boiler house, and a water tank. Each of the proposed buildings would house up to 52,500 birds, with a combined total of 210,000 birds. Each poultry building would measure approximately 94 metres x 25 metres with an eaves height of 2.95 metres and a ridge height of 6.4 metres. They would be of steel portal frame construction, with the walls and roof externally clad in polyester coated profile sheeting.
1.2Other plant and building proposed are as follows: - Eight feed bins, to be located in two groups of four adjacent to the poultry sheds, each measuring 3.7 metres in diameter x 7.5 metres high; - A gate house, measuring 12.5 metres x 9.5 metres with an eaves height of 2.6 metres and a ridge height of 3.4 metres; - A boiler house measuring 18 metres x 10 metres with an eaves height of 6 metres and a ridge height of 7.4 metres; - Two adjacent wood pellet bins, each measuring 3 metres in diameter and 6 metres high; - A water tank measuring 7 metres in diameter and 3 metres in height.
1.3The buildings and feed bins would be coloured juniper green. The boiler house would contain a biomass boiler to provide hot water for the buildings. Ventilation for the proposed buildings would be provided by high velocity ridge fans, and gable fans for hot weather. A landscaped mound would be formed to the south-west of the proposed buildings. Beyond this there would be a surface water attenuation pond. Landscape planting would be undertaken within and around the site. Access to the poultry development would be via the existing farm access track that connects directly to the A458.
1.4Production process: The poultry unit would produce standard birds. They would be brought to the buildings as day old chicks and reared for 38 days. At the end of this period the birds are removed and the buildings are cleaned out. This includes the removal of manure which would be used as a fertiliser on agricultural land, and the washing out of the buildings. Wash water would be drained to a sealed concrete dirty water tank that is emptied by tanker. Cleaning out and preparation of the buildings for the incoming flock would take place over a 10 day period, hence the operation is based on a 48 day cycle which results in 7.5 flocks per annum.
1.5Construction phase: The construction phase would take place over approximately 20 weeks.
Contact: Tim Rogers (01743) 258773 Footbridge Farm, Tasley, Bridgnorth, Planning Committee – 29 August 2017 Shropshire, WV16 5LZ
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Footbridge Farm, Tasley, Bridgnorth, Shropshire, WV16 5LZ (17/01033/EIA)Report | 34 pages | DownloadRead as text |
Follow Southern Planning Committee at Shropshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 May 2026 | MinutesThat the of the meetings of the Southern Planning Committee held on Tuesday 24 February 2026 and 14 May 2026 be appro... | Approved | Open |
| 26 May 2026 | Proposed Residential Development Land East of Ford Shrewsbury Shropshire (25/04301/FUL)RESOLVED That contrary to officer recommendation planning permission be refused for the following reasons: · The appl... | Refused | Open |
| 26 May 2026 | Swancote Energy Ltd Anaerobic Digestion Plant at Swancote Farm, Swancote, Bridgnorth (25/02645/VAR)RESOLVED That in accordance with Officer recommendation planning permission be granted subject to the conditions set ... | Decided | Open |
| 26 May 2026 | Proposed Residential Development Land Off Benthall Lane And Bridge Bank Benthall Broseley Shropshire (25/03946/OUT)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... | Decided | Open |
| 26 May 2026 | Proposed Residential Development Land East Of Shaw Lane Albrighton Shropshire (25/03227/REM)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.