That in accordance with the Officer recommendation, planning permission be granted subject to the conditions set out in appendix 1 of the report and that delegated power be given to the Planning and Development Services Manager in consultation with Legal Services to amend conditions 5,8 and 9
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Responsible Officer: Tracy Darke, Assistant Director of Economy & Place
Summary of Application
Application Number: 22/01264/FUL Parish: Bridgnorth Town Council Proposal: Change of use from training facility (D1) to a sui-generis electronic and electrical materials recovery use using pyrolysis technology, and installation of ancillary plant and equipment (including 2 external flue stacks and one water tank).
Site Address: Building 10, Stanmore Business Park, Bridgnorth, Shropshire, WV15 5HR
Recommendation:- Approve subject to the conditions set out in Appendix 1
Plan 1 - Location REPORT
Page 1 of 21 1.0 THE PROPOSAL
1.1The proposed development involves the installation and operation of processing plant to recover high value metals from small end of life electronic equipment. The proposed use is similar in character to ‘manufacturing’ uses that fall within Use Class B2 General Industrial of The Town and Country Planning (Use Classes) Order 1987. Following discussions with officers however it has been agreed that a sui generis description would better characterise the proposed use.
1.2The majority of the new processing plant and equipment would be installed within the existing building which is the subject to the proposed change of use to allow such manufacturing activity. Certain parts of the air abatement system (flues / stacks) would protrude outside the existing building and as such require planning permission. It is also proposed to install a small water tank to the rear of the building on the rear forecourt.
Plan 2 – Location Block Plan
1.3The dimensions of the proposed external plant and equipment are as follows: Flue stacks (x 2) o Height – 15 metres (m) above ground level o Diameter – 400 millimetres (mm) o Footprint – 0.125 sq.m per stack (0.250 sq.m total) Water tank o Height – 3 m above ground level o Diameter – 4 m o Footprint – 12.5 sq.m.
Page 2 of 21 The total footprint of the proposed ancillary plant and equipment is 12.75 sq.m.
1.4The process technology operates on a ‘batch’ system in a series of low- temperature pyrolysis vessels, allowing close control of the process. The proposed development is for the installation of four vessels, with pairs of vessels sharing a common air abatement system resulting in two flue gas stacks. Batches of approximately 300kg would be processed ensuring that the temperature does not exceed the melting point of metals for recovery. This results in a granular product that is rich in metals. There is no requirement for manual sorting or shredding prior to treatment in the pyrolysis vessels.
1.5The solid output from the process would meet ‘end of waste’2 criteria. This is a definition that is applied by the Environment Agency once it is satisfied that its criteria are met and ensures that the end product can be transported and managed without needing to meet waste regulations. The primary output would be a metal rich recovery ore comprising precious metals and rare earths that would substitute directly for primary raw materials in metals refining. A secondary product of the process would be oversize material in the form of scrap metal that will go for recycling. There would also be a gaseous output that would be captured using a rigorous air abatement system to remove particulates and clean gaseous emissions prior to discharge to atmosphere to achieve regulatory compliance.
1.6All feedstock deliveries would be offloaded within the processing building. No materials, whether feedstock or finished product, would be stored other than within the building. There would therefore be no emissions to land, groundwater or surface water.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.