Resolved
(1) Report number PLA478 by the Head of Planning Policy and Economic Regeneration explaining that GOEM had advised that various changes needed to be made to the Draft Local Development Scheme (LDS) before it can be approved, and setting out the implications of these comments upon the LDF timetable; (2) The most fundamental of these changes is that the three development plan documents cannot be prepared in parallel and that the “Core Strategy for the location and principles of development” should be prepared and subject to examination first. This reflects advice given to the ODPM from the Planning Inspectorate (PINs). Due to the volume of work expected to arise from the new planning system the PINs is unable to commit to a programme of 3 DPD examinations at the same time and that no more than two documents should be taken to examination in any year; (3) The draft timetable for the preparation of the various documents which will form the LDF should be amended to reflect the requirements of GOEM and the PINs. Other Options considered and assessed: If the LDS is not changed the GOEM will not approve it. The Council needs to formally submit the LDS to GOEM by 27 th March 2005 to ensure that it meets the target for planning delivery grant. It is important that GOEM and the PINs approve the Council’s LDS.