to grant planning permission for application P15/S2946/FUL, subject to the following conditions: 1. Work to commence within three years. 2. In accordance with approved plans. 3. Flood risk mitigation – in accordance with flood risk assessment. 4. Construction traffic management plan. 5. Schedule of materials, finishes and detailing. 6. Specification of the archimedes screw. 7. Fish pass design and details. 8. Eel pass design and details. 9. Acoustic assessment. 10. Wildlife protection. 11. No lighting. Informatives 1. Wild bird and nest protection. 2. Public right of way – liaison with Oxfordshire County Council. 3. Flood defence consent.
Word for word from the decision South Oxfordshire published for this meeting.Source: democratic.southoxon.gov.uk
NOTES 1. BOUNDARY OF PERMANENT WORKS OUTLINED IN RED. TEMPORARY WORKS INCLUDING COFFER DAM WILL OCCUPY A SLIGHTLY LARGER AREA.
2. WORKS INCLUDE THE REMOVAL OF THE EXISTING OVERFALL WEIR AND FISH PASS ADJACENT TO THE LOCK ISLAND, AND THE CONSTRUCTION OF A NEW CONTROL HUT FLOOD CONTROL GATE, THREE ARCHIMEDES SCREWS, THEIR SUPPORTING CONCRETE STRUCTURES, AND A NEW LARINIER FISH PASS, A CONTROL BUILDING, A NEW EEL PASS ON GORING WEIR AND MODIFICATIONS TO THE CREST ANGLES ON GORING AND STREATLEY WEIRS. POWER CABLES FIXED TO NEW STRUCTURE AND TO 3. EXACT ROUTE OF UNDERGROUND CABLES FROM EXISTING BRIDGE AND THEN HYDRO PLANT, FISH PASS END OF EXISTING BRIDGE TO CONNECTION TO THE BURIED IN RIVER BED AND ON AND NEW FLOOD GRID TO BE AGREED WITH ENVIRONMENT AGENCY SHORE TO GRID CONNECTION POINT CONTROL GATE IN RIVER AND WITH SWAN HOTEL WITHIN THEIR (EXACT ROUTE YET TO PROPERTY BOUNDARY. BE DETERMINED)
GORING 4. FINISHES ON EXISTING WORKS TO MATCH EXISITING - WEIR STEEL WORK TO BE PAINTED GREY TO MATCH ENVIRONMENT AGENCY'S GATES ETC; STRUCTURE IN EEL PASS FIXED RIVER TO BE PARTAILLY FACED IN BRICK TO MATCH TO SURFACE OF WEIR EXISTING; CHANNELS FOR ARCHIMEDES SCREWS TO BE BARE CONCRETE AS LOCK AND LOCK APPROACHES. LENGTH OF STEEL CREST ANGLE 5. DETAILED DESIGN OF WORKS INCLUDING FISH PASS TO BE RAISED TO BE SUBJECT TO INDEPENDENT REVIEW AND BY 50mm APPROVAL BY ENVIRONMENT AGENCY.
Appendix 2
2 1/16 FOR MODIFIED PLANNNG APPLICATION 1 7/15 FOR PLANNIG APPROVAL
LENGTH OF STEEL CREST ANGLE TO BE LOWERED BY 50mm
Goring and Streatley Community Energy Ltd STREATLEY WEIR Goring & Streatley Hydro Project
SITE PLAN
0 50 Page 38
Scale 1:1000
PL2/001 2 PL2/002/1
NOTES
1. THE ELEVATIONS SHOWN ARE DEVELOPED ALONG THE CURVED LINE OF THE WEIR STRUCTURE
NORMAL DOWNSTREAM WATER LEVEL
EXISTING DEVELOPED DOWNSTREAM ELEVATION
1 7/15 FOR PLANNING APPLICATION
EXISTING UPSTREAM DEVELOPED ELEVATION
Goring and Streatley Community Energy Ltd
Goring & Streatley Hydro Project
EXISTING DEVELOPED ELEVATIONS
0 10 Page 39
Scale 1:250
PL2/002 1 PL2/004/2 NOTES
1 THE ELEVATIONS SHOWN ARE DEVELOPED ALONG THE CURVED LINE OF THE WEIR STRUCTURE.
ACOUSTIC HOOD 45.80m AOD - TOP OF MAINTENANCE HOIST 45.05m AOD - TOP OF ACOUSTIC ENCLOSURES
2 1/16 FOR MODIFIED PLANNING APLICATION 1 7/15 FOR PLANNING APPLICATION NEW LARINIER 3 No. ARCHIMEDES SCREWS NEW 3m WIDE EXISTING 4m WIDE EXISTING OVERFALL WEIR FISH PASS EACH 3.5m DIAMETER FLOOD CONTROL GATE FLOOD CONTROL GATES
PROPOSED UPSTREAM ELEVATION Goring and Streatley Community Energy Ltd
Goring & Streatley Hydro Project
PROPOSED DEVELOPED ELEVATIONS
0 10 Page 40
Scale 1:250
PL2/004 2 PL2/016/1 NOTES
CONTROL HUT CONCRETE WALLS 250 THICK 1. CONTROL HUT TO BE A WATERTIGHT WATERTIGHT DOOR 900 WIDE CONCRETE BUILDING TO PROVIDE FLOOD RESILIENCE TO ELECTRICAL EQUIPMENT INSIDE. STEEL DOOR TO BE WATERTIGHT. WALLS TO BE PAINTED WHITE, DOOR AND ANY TIMBER TO BE PAINTED BLACK WITH PLAN CLAY TILES TO PITCHED ROOF, ALL TO MATCH EXISTING LOCK-KEEPER'S HOUSE. CABLE ENTRIES TO BUILDING TO BE ABOVE VENTILATION GRILLE 100 YEAR FLOOD LEVEL
4500 3500
EAST ELEVATION NORTH ELEVATION
VENTILATION GRILLE
CONTAINMENT FOR CABLE AND HYDRAULIC LINES. ENTRY TO BUILDING ABOVE FLOOD LEVEL. WATERTIGHT DOOR 1 1/16 FOR MODIFIED ;PLANNING APPLICATION CONTAINMENT TO CONNECT TO STRUCTURE IN RIVER VIA ACCESS WALKWAY ACROSS FISH PASS.
.
WEST ELEVATION SOUTH ELEVATION Goring & Streatley Hydro Project
MISCELLANEOUS DETAILS CONTROL HUT ON ISLAND 0 5
Scale 1:100 Page 41
PL2/016 1 Page 42 Photos referenced from Visual Impact Assessment - section 3 of the Environmental Report (Rogers 2009)
View across to weir from Lock footpath - Site visit photo
Page 43 This page is intentionally left blank
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 30 August 2026 as a correct record and agree that the Chair ...
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 15 July 2026 as a correct record and agree that the Chair si...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.