to delegate authority to grant planning permission to the head of planning for application P15/S0779/FUL, subject to: I. The prior completion of a Section 106 agreement to secure the affordable housing, financial contributions and obligations stated above; and II. The following conditions: 1. Commencement two years - full planning permission. 2. Approved plans. 3. Sample materials to be agreed. 4. Slab and ridge levels to be agreed. 5. Compliance with mitigation measures in biodiversity enhancement plan. 6. Construction hours restriction. 7. Appropriate provision for the control of noise and dust to be agreed. 8. Details of external lighting to be agreed. 9. Air quality mitigation to be agreed. 10. Surface water drainage to be agreed. 11. Foul drainage to be agreed. 12. Drainage strategy for any on and off site works to be agreed (in consultation with Thames Water). 13. Impact studies of the existing water supply to be agreed (in consultation with Thames Water). 14. Remediation scheme to be agreed if contamination is found. 15. Landscaping scheme to be agreed. 16. Landscape management scheme to be agreed. 17. Tree protection to be agreed. 18. Green travel plans to be agreed. 19. Visibility splays to be agreed and retained. 20. Off site highway works to be agreed and a timetable for their implementation to include, but not limited to: · details of measures to permanently prevent vehicular access onto Thame Road at existing access point; · details of measures for treatment of area to front of 5 and 7 Mill Lane; · traffic management measures; and · new vehicular access onto Thame Road and Mill Lane. 21. Estate accesses, driveways, parking and turning areas to be provided. 22. Construction traffic management plan to be agreed. 23. Cycle parking to be agreed. 24. No ... view the full minutes text for item 7.
Word for word from the decision South Oxfordshire published for this meeting.Source: democratic.southoxon.gov.uk
Page 65 The scaling of this drawing cannot be assured Revision Date Drn Ckd C Layout revised following pre-app 11 meeting: 1 and 2 beds added to 1.0 8 open market mix, plots rearranged Sp to face pond, car park redesigned. 141003 RW AC 1 11 11 11.0 8.59 1.1 2 0 D 1bed flats replaced, access to car 11 1.1 park revised, some trees moved, as 141008 RW AC 8 per client comments.
TCL: Revised to landscapers and engineers' 129.52 E comments. 141010 RW AC
Revised following pre-app comments 141121 RW JTo F from SODC-letter dated 03.Nov.14 TCL: 133.84 G Revised following client comments 141128 RW DH
H Layout revised to client comments 141201 RW DH 11 8.2 1
Minor changes to layout following TCL: 125.52 J meeting with Parish Council. 141202 RW JTo
6 Red line amended, highways and 12 0.6 K 141208 RW JTo HCL : landscape updated following team review.
141209 RW JTo Additional visitor car parking. HC L :1 11 9.5 L 18 6 .00 Red line revised, additional visitor
AS 421 33 spaces, amendment to plot 5 and 33 Infiltration Basin M 141212 RW JTo garages, LTH parking spaces shown.
33 V Layout revised to client comments. 34 32 V N 17.12.14 RW JTo 32 32 Landscape detail added to POS areas Swale P and front gardens. 19.12.14 RW JTo 11 9.9 2 34 4 31 45 31 357 housetype replaced 303 and 305 42 1 SG AR Q 06.03.15 NG RW H 37 as per client comments 454 V TCL: 35 H 38 126.91 414 38 353 housetype replaced 357 as per V R 06.03.15 NG JTo client comments AS 414 12 31 4 45 39 0.3 TCL: 3 38 127.85 19.03.15 JT CC
V V 37 39 S 454 Dormers updated H 14
H 4
LT 4P V 36 2B H LT 40 T Plots 12-15 bin/cycle storage revised 07.04.15 RW JTo V 4P 39 2B V TCL: 41 128.24
V 36 40 U Reduction of affordable cluster 14.04.15 RW JTo 47 48 following housing officer comments.
AR 36 40
SG 48 47 2B 47 4P V Community parking arrangement 19.05.15 NG RW
H 42 41 LT
3 TCL: 12
48 H 2B 42 54 126.36 0.5 2 amended. 4P 46
41 29 30
LT H 54 29 2B H
Plot 6 rear fence amended. Visitor 1
42 34 4P LT 43 W 10.06.15 JT SP 28 parking opposite 28/29 refined.
3 H
20 AR 30 2.
H SG 28 4m
LT 46 SG
4P x
3B AR H 44 90
2B Planning Layout updated to Sketch 08.01.16 NG
5P LT 27 m X JT
H 4P 46
LT VI
LT 2B SI Layout SK-02d.
H 29
4P BI H HC 54
3B LT
2B L: 45 LI
5P P
44 11 9 2B 4 AR TY
53 .66
LT SG Sp Z Minors Changes to layout 15.01.16 NG JT
H 6 28 35
11 52
9.753
7 45 6 26
43 35 27 H EL ZA Parking spaces amended to council 22.01.16 NG JT
52 M 25
55 AS EL guidance
3B5 M 57 26
H 4 R
P L 41 E ARWN
TH 52 ZB Parking allocation and schedule NG JT
55 DG /O
Appendix B 58 13.02.16 D
3B5 56 updated
AR 6
55 P L 35
SG
3 35 ZC Timber knee rail added around 02.03.16 NG JT
TH
H 51 24
TH 6
community parking and infiltration 35
AM
60 25
3 51
35 ER basin. Brick walls to all parking courts.15.03.16 NG JT 23
H 24 OA AR
50 ZD Amended to comments from Forestry
57 SGAR SG
D 23
officer and client. H LT
ZE Mill Lane stopping up shown, cross 24.03.16 JK
AS JT
56 P B4
12 2
1. H
14 shown. LT
59 23 22
V 4P
ZF Minor changes following client and 04.04.16 NG JT
H 2B
353 V 59 22
21 49 consultant comments. ZG Bin store locations added JT
V NG
356 22 61 08.04.16 49
H
V 60 D OA H
V AR 35 3 R
356 ER SG W V R NE
V 6 D/OAWR LO 21 35 THRU DG D/ 61 LEGEND
356 6
AS 35 19 Site Boundary 20 20
ENT) Sp
1BF Affordable Housing
NEW ALIGNM R 19 OWR NE 1BF D/ GA D 17-18 TCL: 126.45 Feature Building 18
Sp 16 17
10 9 .29 Fence 1.8m Panel Fence 3
MILL LANE ( 12 H
8 LT
11 AS 10-13 313 Fence 1.8m Closeboard 6P 4B
309 Wall 1.8m Screen Brick
AS SGAR 9
BIN/ 16
SGAR 8 1.2m Post and Rail Fence
CYC 16
450mm Timber Knee Rail 14
.37 7 12 1
SGAR
203 Green Screen Fencing 14
5 15
6 )
6 3B T External Bins Store EN
6 5P TCL:
203 15
131.89 M GN LT
1 Plot Numbers 7 I H
5 AL
7 3B
G 5
IN P
Single Pedestrian Gate (1m)
4 ST LT
1 XI H
1.412
309 14 4 E MILL LANE TO BE STOPPED UP.
AS 4 ( Lifetime Homes Parking Strip 3 3 NE AREA OF PLANTING TO BE LA LL PROVIDED TO CREATE BUFFER Differential highways surface treatment
203 TCL: 15 3 MI 132.50 AND PREVENT "SEE THROUGH" FROM LOWER ROAD
203 * Refer to Detailed Landscape proposals for detailed landscape notes 0.81 2 12
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 30 August 2026 as a correct record and agree that the Chair ...
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 15 July 2026 as a correct record and agree that the Chair si...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.