RESOLVED : Having regard to the current appeal against non-determination, officers recommended that had the council determined application P17/S3231/O, it would have refused planning permission for the following reasons: 1. That the traffic arising from the development would add to the residual cumulative impacts on the local road network, most notably through Watlington Town Centre. The proposal would increase congestion and delays and would be harmful to highway safety. The proposal is therefore contrary to the National Planning Policy Framework, Policy CSM2 of the South Oxfordshire Core Strategy, Policy T1 of the South Oxfordshire Local Plan 2011, and Policies P2 and site-specific Policy Site A of the Watlington Neighbourhood Development Plan. 2. That the proposed development would increase congestion and delays within Watlington Town Centre and would have a severe adverse impact on Watlington’s Air Quality Management Area. The proposal is therefore contrary to the National Planning Policy Framework, Policy CSM1 of the South Oxfordshire Core Strategy, Policy EP1 of the South Oxfordshire Local Plan 2011, and Policy P2 of the Watlington Neighbourhood Development Plan. 3. In the absence of a completed S106 legal agreement, the proposal fails to secure affordable housing to meet the needs of the District. As such, the development would be contrary to the National Planning Policy Framework, Policy CSH3 of the South Oxfordshire Core Strategy and Policy Site A of the Watlington Neighbourhood Development Plan. 4. In the absence of a completed Section 106 legal agreement, the proposal fails to secure infrastructure necessary to meet the needs of the development. As such, the development would be contrary to the National Planning Policy Framework, Policy CSI1 and CSM2 of the South Oxfordshire Core Strategy and Policies T1, D10, D12, R2 ... view the full minutes text for item 230.
Word for word from the decision South Oxfordshire published for this meeting.Source: democratic.southoxon.gov.uk
Page 31 Appendix B Page 32 The scaling of this drawing cannot be assured Pond 9 11 7 Revision Date Drn Ckd 5 B Amended as per latest sketch layout 24.07.18 KU GA
33 1 3
24 36 Pond 2 2
1 10 N
10 8 12 14
11 LEGEND
2 16 40
6 Issues 7 5 21
Mast (Telecommunication) 30 20 60 100m 1 3
28 0 40 80 36
2 32 26 Dr
15 ain 20 23
9 Site Boundary
El 9.66 Ha 18 22
Su a
8 St
b St b Su
a 27
El 10 16
23 Residential 6.31 Ha
14 6
24 St Leonard's Employment Area 1 0.19 Ha Church (B1a)
35 2
Lych Gate
Open space 3.16 Ha
in Dra
3 Sinks 3d
Please refer to the Site Layout Schedule for the exact area GP Hall
32 35 Pound Close
5 1
Masts 2
(Telecommunication) 33 Caravan Park 6
28 Tr ac
26 k Issues
8 15
6 25
1 Pr lace a 23
os P 18 23
pe 7
ct 5
a k
1 21 ac
14 21 Tr
19 29 Sluice
12 17
b Issues
15 k
Ta
1 n Ta
nk 12
17 Watlington 1 El Sub Sta 2 11 Industrial Estate Unit C 2 7 nk 10 Ta
W wo 22
s 3 5
ay T 1 FBs 14
5 24 12
6 Project 1 100.1m LB 6 The 2 Land at Britwell Road
Offices at Birmingham Bristol Cambridge Cardiff Ebbsfleet Edinburgh Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No 100019279. J:\25000 - 25999\25700 - 25799\25788 - Watlington - Land At\A4 - Dwgs & Registers\Master Planning\Drawings\25788 9600 Land Use Plan_rev B.dwg - A3 Glasgow Leeds London Manchester Newcastle Reading Southampton The scaling of this drawing cannot be assured Pond 9 11 7 Revision Date Drn Ckd 5 A Amended as per latest sketch layout 24.07.18 KU MV
33 1 3
24 36 Pond 2 2
1 10 N
10 8 12 14
11 LEGEND
2 16 40
6 Issues 7 5 21
Mast (Telecommunication) 30 20 60 100m 1 3
28 0 40 80 36
2 32 26 Dr
15 ain 20 23
9 Site Boundary
El 18 22
Su a
8 St
b St b Su
a 27
El 10 16
23 Site Access
14 6
24 St Leonard's 1 Church Pedestrian Access
35 2
Lych Gate
Employent Access
in Dra
3 Sinks 3d
Primary Movement Route GP Hall (Vehicle, Pedestrian and Cycle)
32 35 Pound Close
5 Employment Access Route 1
Masts 2
(Telecommunication) 33 Caravan Park 6
28 Tr ac
26 k Issues Pedestrian and Cycle Route
8 15
6 25
1 Future extension of alternative route
Pr lace a 23
os P 18 (by others)
pe 7
ct 5
a k
1 21 ac
14 21 Tr
19 29 Sluice Easement
12 17
b Issues
15 k
Ta
1 n Ta
nk 12
17 Watlington El Sub Sta 2 11 1 Footpath Link Industrial Estate Unit C 2 7 nk 10 Ta
W wo 22
s 3 5
ay T 1 FBs 14
5 24 12
6 Project 1 100.1m LB 6 The 2 Land at Britwell Road
Offices at Birmingham Bristol Cambridge Cardiff Ebbsfleet Edinburgh Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No 100019279. J:\25000 - 25999\25700 - 25799\25788 - Watlington - Land At\A4 - Dwgs & Registers\Master Planning\Drawings\25788 9603 Access And Movement Plan_rev A.dwg - A3 Glasgow Leeds London Manchester Newcastle Reading Southampton The scaling of this drawing cannot be assured Revision Date Drn Ckd A Amended as per latest sketch layout 24.07.18 CB JT
E OS CL
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 30 August 2026 as a correct record and agree that the Chair ...
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 15 July 2026 as a correct record and agree that the Chair si...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.