to approve planning application P23/S1036/FUL, subject to the following conditions: 1: Commencement development within 3 years of the date of permission 2: Implemented development in accordance with approved plans 3: Schedule of external materials to be submitted and approved in writing by the local planning authority 4: Parking & Manoeuvring Areas as shown on plan to be retained 5: Tree Protection (Detailed) details to be submitted and approved ... view the full minutes text for item 68.
Word for word from the decision South Oxfordshire published for this meeting.Source: democratic.southoxon.gov.uk
Page 85 Copyright Fineline Architects Ltd. This drawing, or any of its contents, may not be copied, reproduced or distributed without the written consent of Fineline Architects. Do not scale off this drawing. Figured dimensions to be taken from this drawing only. All contractors, subcontractors and/or specialists are responsible for taking and checking all dimensions relating to their work on site. This drawing is to be read in conjunction with all consultants information.
Revision Issue Date Drn Chk
N
SCALE 1:1250
0 25 50 75 (M.)
GENERAL NOTES - LOCATION 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL GENERAL ARRANGEMENT, PROJECT DETAILS, SPECIFICATIONS AND CONSULTANTS DRAWINGS.
2. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO ORCHARD COTTAGE STRUCTURAL FACES AND/OR PARTITION STUDS.
3. LEGEND
APPLICATION BOUNDARY
LINE OF OWNERSHIP
4. ALL ELEMENTS OF WORK TO BE INSTALLED ACCORDING TO THE APPROPRIATE MANUFACTURER'S INSTRUCTIONS.
Status
PLANNING
Project
ORCHARD COTTAGE BINFIELD HEATH, RG9 4JZ Drawing Title
LOCATION PLAN
Date Scale Drawn by Check by
NOV 2022 1:1250 @ A3 CA KB Project No. Drawing No. Revision
22.128 PL.1200 -
Fineline Architects Page 86
T. [phone removed]
Appendix B E. [email removed]
W. www.finelinearchitects.co.uk Copyright Fineline Architects Ltd. This drawing, or any of its contents, may not be copied, reproduced or distributed without the written consent of Fineline Architects. Do not scale off this drawing. Figured dimensions to be taken from this drawing only. All contractors, subcontractors and/or specialists are responsible for taking and checking all dimensions relating to their work on site. This drawing is to be read in conjunction with all consultants information.
Revision Issue Date Drn Chk
N
SCALE 1:500
0 10 20 30 (M.)
GENERAL NOTES - SITE PLAN 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL GENERAL ARRANGEMENT, PROJECT DETAILS, SPECIFICATIONS AND CONSULTANTS DRAWINGS.
2. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO STRUCTURAL FACES AND/OR PARTITION STUDS. ORCHARD COTTAGE 3. LEGEND
APPLICATION BOUNDARY
LINE OF OWNERSHIP
4. ABBREVIATIONS;
SVP SOIL AND VENT PIPE DP DRAINAGE POINT RWP RAIN WATER PIPE BIG BACK INLET GULLY
5. ALL ELEMENTS OF WORK TO BE INSTALLED ACCORDING TO THE APPROPRIATE MANUFACTURER'S INSTRUCTIONS.
Status
PLANNING
Project
ORCHARD COTTAGE BINFIELD HEATH, RG9 4JZ Drawing Title
EXISTING BLOCK PLAN
Date Scale Drawn by Check by
NOV 2022 1:500 @ A3 CA KB Project No. Drawing No. Revision
22.128 PL.1201 -
Fineline Architects Page 87
T. [phone removed]
E. [email removed]
W. www.finelinearchitects.co.uk Copyright Fineline Architects Ltd. This drawing, or any of its contents, may not be copied, reproduced or distributed without the written consent of Fineline Architects. Do not scale off this drawing. Figured dimensions to be taken from this drawing only. All contractors, subcontractors and/or specialists are responsible for taking and checking all dimensions relating to their work on site. This drawing is to be read in conjunction with all consultants information.
Revision Issue Date Drn Chk
N
SCALE 1:500
0 10 20 30 (M.)
GENERAL NOTES - SITE PLAN 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL GENERAL ARRANGEMENT, PROJECT DETAILS, SPECIFICATIONS AND CONSULTANTS DRAWINGS.
2. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO STRUCTURAL FACES AND/OR PARTITION STUDS. ORCHARD COTTAGE 3. LEGEND
APPLICATION BOUNDARY
LINE OF OWNERSHIP
4. ABBREVIATIONS;
SVP SOIL AND VENT PIPE DP DRAINAGE POINT RWP RAIN WATER PIPE BIG BACK INLET GULLY
5. ALL ELEMENTS OF WORK TO BE INSTALLED ACCORDING TO THE APPROPRIATE MANUFACTURER'S INSTRUCTIONS.
Status
PLANNING
Project
ORCHARD COTTAGE BINFIELD HEATH, RG9 4JZ Drawing Title
PROPOSED BLOCK PLAN
Date Scale Drawn by Check by
NOV 2022 1:500 @ A3 CA KB Project No. Drawing No. Revision
22.128 PL.1210 -
Fineline Architects Page 88
T. [phone removed]
E. [email removed]
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 30 August 2026 as a correct record and agree that the Chair ...
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 15 July 2026 as a correct record and agree that the Chair si...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.